First Results on Resource-Constrained Project Scheduling with Model-Endogenous Decision on the Project Structure
From MaRDI portal
Publication:5171825
DOI10.1007/978-3-319-00795-3_64zbMath1305.90189OpenAlexW5408523MaRDI QIDQ5171825
Publication date: 12 February 2015
Published in: Operations Research Proceedings (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-319-00795-3_64
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (1)
Cites Work
- Unnamed Item
- Scheduling projects with heterogeneous resources to meet time and quality objectives
- Stochastic project networks. Temporal analysis, scheduling and cost minimization
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Scheduling of resource-constrained projects
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Project scheduling with multiple modes: A genetic algorithm
This page was built for publication: First Results on Resource-Constrained Project Scheduling with Model-Endogenous Decision on the Project Structure