Stochastic project networks. Temporal analysis, scheduling and cost minimization
policy iterationprecedence constraintssingle-machine schedulingcost minimizationMarkov renewal processesproject planninganalytical networksGERT networksmaximum expected latenessstochastic project networkstemporal analysisweighted expected flow-time
Deterministic scheduling theory in operations research (90B35) Dynamic programming (90C39) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20) Research exposition (monographs, survey articles) pertaining to operations research and mathematical programming (90-02) Applications of Markov renewal processes (reliability, queueing networks, etc.) (60K20) Stochastic network models in operations research (90B15)
- scientific article; zbMATH DE number 4204100
- Generalized stochastic network models for the management of complex projects
- An optimization model for stochastic project networks with cash flows
- Computing bounds on project duration distributions for stochastic PERT networks
- A heuristic method for the estimation of the project duration in a stochastic network scheduling
- A computational study on bounding the makespan distribution in stochastic project networks
- Project management for arbitrary random durations and cost attributes by applying network approaches
- Activity Delay in Stochastic Project Networks
- A computational study on bounding the makespan distribution in stochastic project networks
- EOR project networks
- A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs
- Recent Developments In Stochastic Activity Networks
- scientific article; zbMATH DE number 4204100 (Why is no real title available?)
- Metaheuristics for the bi-objective resource-constrained project scheduling problem with time-dependent resource costs: an experimental comparison
- GERT models in an educational institution
- Scheduling of design projects with uncertain number of iterations
- Algorithms for single-machine scheduling with stochastic outtree precedence relations to minimize expected weighted flow time or maximum expected lateness
- A simulation approach for evaluation and improvement of organisational planning in collaborative product development projects
- Scheduling resource-constrained projects with a flexible project structure
- scientific article; zbMATH DE number 3939078 (Why is no real title available?)
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- scientific article; zbMATH DE number 3939077 (Why is no real title available?)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
- scientific article; zbMATH DE number 3286870 (Why is no real title available?)
- A survey of variants and extensions of the resource-constrained project scheduling problem
- First results on resource-constrained project scheduling with model-endogenous decision on the project structure
- Time complexity of single machine scheduling with stochastic precedence constraints
This page was built for publication: Stochastic project networks. Temporal analysis, scheduling and cost minimization