A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
DOI10.1016/J.AMC.2007.04.096zbMATH Open1180.90125OpenAlexW1985909617MaRDI QIDQ2467429FDOQ2467429
Abdelwaheb Rebaï, N. Damak, Patrick Siarry, Bassem Jarboui
Publication date: 21 January 2008
Published in: Applied Mathematics and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.amc.2007.04.096
Recommendations
- Particle swarm optimization for resource-constrained project scheduling problem
- An efficient particle swarm optimizer with application to man-day project scheduling problems
- Hybrid particle swarm and differential evolution algorithm for solving multimode resource-constrained project scheduling problem
- A modified PSO algorithm for minimizing the total costs of resources in MRCPSP
- Probability mechanism based particle swarm optimization algorithm and its application in resource-constrained project scheduling problems
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35) Combinatorial optimization (90C27)
Cites Work
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Title not available (Why is that?)
- A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem
- Resource-constrained project scheduling. Exact methods for the multi-mode case
- DSS for multiobjective project scheduling
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- Project scheduling with multiple modes: A comparison of exact algorithms
- A discrete version of particle swarm optimization for flowshop scheduling problems
Cited In (41)
- Project scheduling heuristics-based standard PSO for task-resource assignment in heterogeneous grid
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- Optimizing version release dates of research and development long-term processes
- A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting
- Numerical solution of certain exponential and non-linear Diophantine systems of equations by using a discrete particle swarm optimization algorithm
- An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains
- A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags
- An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem
- Considering project management activities for engineering design groups
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Hybrid particle swarm and differential evolution algorithm for solving multimode resource-constrained project scheduling problem
- An efficient relax-and-solve method for the multi-mode resource constrained project scheduling problem
- Resource tardiness weighted cost minimization in project scheduling
- Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic
- Particle swarm optimization for resource-constrained project scheduling problem
- A modified PSO algorithm for minimizing the total costs of resources in MRCPSP
- Multi-mode resource availability cost problem with recruitment and release dates for resources
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
- A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
- Reactive scheduling in the multi-mode RCPSP
- Multimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedure
- A dynamic intelligent decision approach to dependency modeling of project tasks in complex engineering system optimization
- The effect of velocity sparsity on the performance of cardinality constrained particle swarm optimization
- Integrated multi-project planning and scheduling -- a multiagent approach
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem
- Differential evolution for solving multi-mode resource-constrained project scheduling problems
- Model and algorithm for human resource-constrained R\&D program scheduling optimization
- An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources
- Gravitational particle swarm
- A data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problem
- Multimode time-cost-robustness trade-off project scheduling problem under uncertainty
- Bio-inspired meta-heuristics for emergency transportation problems
- A mixed-discrete particle swarm optimization algorithm with explicit diversity-preservation
- Mode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problem
- An efficient particle swarm optimizer with application to man-day project scheduling problems
- Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies
This page was built for publication: A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2467429)