Project scheduling heuristics-based standard PSO for task-resource assignment in heterogeneous grid
DOI10.1155/2011/589862zbMATH Open1214.90051OpenAlexW1975568929WikidataQ58654327 ScholiaQ58654327MaRDI QIDQ535971FDOQ535971
Publication date: 16 May 2011
Published in: Abstract and Applied Analysis (Search for Journal in Brave)
Full work available at URL: https://eudml.org/doc/222957
Recommendations
- Job scheduling in computational grid using a hybrid algorithm based on genetic algorithm and particle swarm optimization
- A hybrid heuristic of variable neighbourhood descent and great deluge algorithm for efficient task scheduling in grid computing
- An efficient meta-heuristic algorithm for grid computing
- Large-Scale Scientific Computing
- Optimal resource model and task scheduling algorithm based on dynamic load balancing strategy in grid
Problem solving in the context of artificial intelligence (heuristics, search strategies, etc.) (68T20) Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Optimization by Simulated Annealing
- Collective dynamics of ‘small-world’ networks
- Tabu Search—Part I
- A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
- Resource-constrained project scheduling: A survey of recent developments.
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times
- A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem
- A branch and bound algorithm for the generalized assignment problem
- Tabu Search—Part II
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- An ACO algorithm for a dynamic regional nurse-scheduling problem in Austria
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms
- Project scheduling with multiple modes: A genetic algorithm
- Simulated annealing for multi-mode resource-constrained project scheduling
- Tabu search for single machine scheduling with distinct due windows and weighted earliness/tardiness penalties
- Project scheduling with multiple modes: A comparison of exact algorithms
- Novel scheduling strategy for downlink multiuser MIMO system: Particle swarm optimization
- Title not available (Why is that?)
Cited In (6)
- Radial basis function neural network based on an improved exponential decreasing inertia weight-particle swarm optimization algorithm for AQI prediction
- Determination of endometrial carcinoma with gene expression based on optimized Elman neural network
- A nonlinear multiobjective bilevel model for minimum cost network flow problem in a large-scale construction project
- Simulated annealing-based krill herd algorithm for global optimization
- Solving university course timetabling problems using constriction particle swarm optimization with local search
- An efficient particle swarm optimizer with application to man-day project scheduling problems
Uses Software
This page was built for publication: Project scheduling heuristics-based standard PSO for task-resource assignment in heterogeneous grid
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q535971)