Multi-mode resource availability cost problem with recruitment and release dates for resources
From MaRDI portal
Publication:1634132
DOI10.1016/j.apm.2014.04.009zbMath1428.90065OpenAlexW2022075530MaRDI QIDQ1634132
Publication date: 17 December 2018
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2014.04.009
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (5)
Multi-mode resource constrained project scheduling problem along with contractor selection ⋮ Evolutionary algorithms for multi-objective stochastic resource availability cost problem ⋮ An updated survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Multi-parallel work centers scheduling optimization with shared or dedicated resources in low-volume low-variety production systems ⋮ Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems
Cites Work
- Optimization by Simulated Annealing
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers
- A double genetic algorithm for the MRCPSP/max
- A neurogenetic approach for the resource-constrained project scheduling problem
- Bi-objective resource-constrained project scheduling with robustness and makespan criteria
- A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
- An exact algorithm for minimizing resource availability costs in project scheduling
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Simulated annealing and tabu search for multi-mode project payment scheduling
- Scheduling subject to resource constraints: Classification and complexity
- An exact algorithm for project scheduling with multiple modes
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- ProGen/\(\pi x\) -- An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
- A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem
- A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
- Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
- Scatter search for project scheduling with resource availability cost
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- Convergence of an annealing algorithm
- Optimization guided lower and upper bounds for the resource investment problem
- Minimizing Resource Availability Costs in Time-Limited Project Networks
- Simulated annealing for multi-mode resource-constrained project scheduling
This page was built for publication: Multi-mode resource availability cost problem with recruitment and release dates for resources