Differential evolution for solving multi-mode resource-constrained project scheduling problems
From MaRDI portal
Publication:1010277
DOI10.1016/j.cor.2008.11.010zbMath1179.90134OpenAlexW2012313434MaRDI QIDQ1010277
N. Damak, Taïcir Loukil, Bassem Jarboui, Patrick Siarry
Publication date: 3 April 2009
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2008.11.010
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35)
Related Items (22)
Generating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertainty ⋮ Network and contract optimization for maintenance services with remanufacturing ⋮ A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem ⋮ Integrated multi-project planning and scheduling -- a multiagent approach ⋮ Project scheduling with finite or infinite number of activity processing modes -- a survey ⋮ Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic ⋮ A data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problem ⋮ An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem ⋮ Branch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurement ⋮ Considering project management activities for engineering design groups ⋮ A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags ⋮ A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem ⋮ Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies ⋮ An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances ⋮ A hybrid differential evolution algorithm with column generation for resource constrained job scheduling ⋮ A differential evolution algorithm to solve redundancy allocation problems ⋮ A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem ⋮ Metaheuristics for the online printing shop scheduling problem ⋮ Hybrid particle swarm and differential evolution algorithm for solving multimode resource-constrained project scheduling problem ⋮ A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem ⋮ Resource-Constrained Scheduling with Non-constant Capacity and Non-regular Activities ⋮ Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization
Cites Work
- A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- DSS for multiobjective project scheduling
- Differential evolution -- a simple and efficient heuristic for global optimization over continuous spaces
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
- Project scheduling with multiple modes: A comparison of exact algorithms
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Unnamed Item
This page was built for publication: Differential evolution for solving multi-mode resource-constrained project scheduling problems