Stochastic resource leveling in projects with flexible structures
From MaRDI portal
Cites work
- A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem
- A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations
- A genetic algorithm for the robust resource leveling problem
- A numerical study of some modified differential evolution algorithms
- A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations
- A robust two-phase heuristic algorithm for the truck scheduling problem in a resource-constrained crossdock
- A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
- Benders decomposition for a period-aggregated resource leveling problem with variable job duration
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Differential evolution -- a simple and efficient heuristic for global optimization over continuous spaces
- Differential evolution for solving multi-mode resource-constrained project scheduling problems
- Exact methods for the resource levelling problem
- scientific article; zbMATH DE number 2013754 (Why is no real title available?)
- Hybrid differential evolution algorithm for the resource constrained project scheduling problem with a flexible project structure and consumption and production of resources
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- Mixed-integer linear programming for resource leveling problems
- Modelling and solving generalised operational surgery scheduling problems
- Optimal resource leveling using non-serial dynamic programming
- Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
- Production scheduling with alternative process plans
- PSPLIB -- a project scheduling problem library
- Resource leveling in make-to-order production: modeling and heuristic solution method
- Resource leveling in projects with flexible structures
- Resource levelling for projects with schedule-dependent time windows
- Scheduling resource-constrained projects with a flexible project structure
- Software project scheduling under activity duration uncertainty
- Stochastic project scheduling with hierarchical alternatives
- The sample average approximation method for stochastic discrete optimization
- Uncertain resource leveling problem
- When it is worthwhile to work with the stochastic RCPSP?
- Work package sizing and project performance
This page was built for publication: Stochastic resource leveling in projects with flexible structures
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6979397)