Andreas Drexl

From MaRDI portal
Person:633481

Available identifiers

zbMath Open drexl.andreasMaRDI QIDQ633481

List of research outcomes

PublicationDate of PublicationType
Lower Bounds for the Capacitated Facility Location Problem Based on Column Generation2012-02-21Paper
Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints2012-02-19Paper
Note: On Semi-Active Timetabling in Resource-Constrained Project Scheduling2012-02-12Paper
Project Scheduling Under Partially Renewable Resource Constraints2012-02-12Paper
Fast Approximation Methods for Sales Force Deployment2012-02-12Paper
Introduction to operations research.2011-04-19Paper
Branching Based on Home-Away-Pattern Sets2011-04-07Paper
Round robin tournaments and three index assignments2011-04-01Paper
Non-linear anonymous pricing combinatorial auctions2009-12-07Paper
A branch-and-price algorithm for scheduling sport leagues2009-08-28Paper
A branching scheme for finding cost-minimal round robin tournaments2009-04-08Paper
Long-term staffing based on qualification profiles2009-03-25Paper
IP models for round robin tournaments2008-11-20Paper
Reflections about pseudo-dual prices in combinatorial auctions2008-08-12Paper
Workforce planning in the printing industry2007-11-26Paper
Algorithms for the car sequencing and the level scheduling problem2007-05-15Paper
Introduction to operations research.2007-03-22Paper
Inventory-based dispatching of automated guided vehicles on container terminals2006-10-25Paper
Scheduling the professional soccer leagues of Austria and Germany2006-01-18Paper
Network decomposition-based benchmark results for the discrete time-cost tradeoff problem2005-04-21Paper
Optimization guided lower and upper bounds for the resource investment problem2005-03-16Paper
Generating two-terminal directed acyclic graphs with a given complexity index by constraint logic programming2005-02-22Paper
Facility location models for distribution system design2005-02-09Paper
Some insights into proportional lot sizing and scheduling2005-01-19Paper
https://portal.mardi4nfdi.de/entity/Q31517832002-12-08Paper
Allocation of partially renewable resources: Concept, capabilities, and applications2002-11-18Paper
Proportional lot sizing and scheduling: Some extensions2002-07-21Paper
Project scheduling with multiple modes: A comparison of exact algorithms2002-07-21Paper
Discrete Lotsizing and Scheduling by Batch Sequencing2002-04-17Paper
https://portal.mardi4nfdi.de/entity/Q27123632001-05-06Paper
ProGen/\(\pi x\) -- An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions2001-01-11Paper
Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application2000-11-21Paper
Distribution requirements and compactness constraints in school timetabling2000-11-21Paper
Model-based inference in CHARME.2000-06-21Paper
Resource-constrained project scheduling: Notation, classification, models, and methods2000-06-14Paper
Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm1999-07-11Paper
https://portal.mardi4nfdi.de/entity/Q42470571999-06-16Paper
Lot sizing and scheduling -- survey and extensions1999-02-22Paper
Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem1998-08-16Paper
An exact algorithm for project scheduling with multiple modes1997-10-30Paper
Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems1997-09-15Paper
A Comparison of Constraint and Mixed-Integer Programming Solvers for Batch Sequencing with Sequence-Dependent Setups1997-03-25Paper
Adaptive search for solving hard project scheduling problems1996-12-16Paper
Sequential-analysis Based Randomized-regret-methods for Lot-sizing and Scheduling1996-08-05Paper
Exercises book on operations research1996-03-12Paper
Introduction to operations research1996-03-12Paper
Introduction to Operations Research1992-09-17Paper
Kapazitätsplanung in Netzwerken. Ein Überblick über neuere Modelle und Verfahren. (Resource-constrained project planning in networks. A survey on new models and methods)1991-01-01Paper
Scheduling of Project Networks by Job Assignment1991-01-01Paper
https://portal.mardi4nfdi.de/entity/Q47350241989-01-01Paper
A simulated annealing approach to the multiconstraint zero-one knapsack problem1988-01-01Paper
Location and layout planning. An international bibliography1985-01-01Paper
ADD-heuristics' starting procedures for capacitated plant location models1985-01-01Paper
A comparative study of some discrete descent approaches in stratified sampling1984-01-01Paper
An efficient two-stage heuristic stratification and Neyman-allocation procedure1983-01-01Paper
https://portal.mardi4nfdi.de/entity/Q36686221983-01-01Paper
https://portal.mardi4nfdi.de/entity/Q47489771983-01-01Paper
https://portal.mardi4nfdi.de/entity/Q30421571982-01-01Paper

Research outcomes over time


Doctoral students

No records found.


Known relations from the MaRDI Knowledge Graph

PropertyValue
MaRDI profile typeMaRDI person profile
instance ofhuman


This page was built for person: Andreas Drexl