Proportional lot sizing and scheduling: Some extensions
From MaRDI portal
Publication:4540068
DOI<85::AID-NET2>3.0.CO;2-E 10.1002/(SICI)1097-0037(199809)32:2<85::AID-NET2>3.0.CO;2-EzbMath1002.90024MaRDI QIDQ4540068
Publication date: 21 July 2002
Full work available at URL: https://doi.org/10.1002/(sici)1097-0037(199809)32:2<85::aid-net2>3.0.co;2-e
90B35: Deterministic scheduling theory in operations research
Related Items
A tabu search heuristic for scheduling the production processes at an oil refinery, Combinação de abordagens GLSP e ATSP para o problema de dimensionamento e sequenciamento de lotes de produção de suplementos para nutrição animal, Explicit modeling of multi-period setup times in proportional lot-sizing and scheduling problem with variable capacity, Multi-level single machine lot-sizing and scheduling with zero lead times, Lot sizing and scheduling -- survey and extensions, Simultaneous lotsizing and scheduling considering secondary resources: a general model, literature review and classification, Workforce planning in a lotsizing mail processing problem, A lot-sizing and scheduling model for multi-stage flow lines with zero lead times, Simultaneous lotsizing and scheduling problems: a classification and review of models