A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags
DOI10.1007/s11227-007-0158-9zbMath1187.90143OpenAlexW2029066203MaRDI QIDQ929315
S. Mohammad Seyed-Hosseini, Majid Sabzehparvar
Publication date: 17 June 2008
Published in: The Journal of Supercomputing (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11227-007-0158-9
Symbolic computation and algebraic computation (68W30) Deterministic scheduling theory in operations research (90B35) Combinatorial optimization (90C27) Computational methods for problems pertaining to operations research and mathematical programming (90-08)
Related Items (11)
Cites Work
- Unnamed Item
- Vague knowledge search in the design for outsourcing using fuzzy decision tree
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- Activity nets: A guided tour through some recent developments
- Project scheduling. A research handbook.
- A linear programming and constraint propagation-based lower bound for the RCPSP
- The multi-mode resource-constrained project scheduling problem with generalized precedence relations
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
- Tight LP bounds for resource constrained project scheduling
- Project scheduling with time windows. From theory to applications.
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Project scheduling with multiple modes: A comparison of exact algorithms
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
This page was built for publication: A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags