New fuzzy models for time-cost trade-off problem
From MaRDI portal
Publication:975376
DOI10.1007/s10700-010-9076-zzbMath1231.90235OpenAlexW2029073184MaRDI QIDQ975376
Xin Gao, Wei-Hua Xu, Hua Ke, Wei-Min Ma
Publication date: 9 June 2010
Published in: Fuzzy Optimization and Decision Making (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10700-010-9076-z
Management decision making, including multiple objectives (90B50) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items
Solving project scheduling problem with the philosophy of fuzzy random programming ⋮ Project scheduling problem with fuzzy activity durations: a novel operational law based solution framework ⋮ A bilevel fuzzy principal-agent model for optimal nonlinear taxation problems ⋮ A fuzzy matching model with Hurwicz criteria for one-shot multi-attribute exchanges in e-brokerage ⋮ Comparison of a fuzzy genetic and simulated annealing algorithm approach for project time-cost tradeoff
Cites Work
- Unnamed Item
- Unnamed Item
- Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem
- Fuzzy project scheduling problem and its hybrid intelligent algorithm
- A survey of credibility theory
- Depedent-chance programming: A class of stochastic optimization
- The use of fuzzy variables in PERT
- Fuzzy sets as a basis for a theory of possibility
- Using fuzzy set theory in a scheduling problem: A case study
- Chance constrained programming with fuzzy parameters
- Job-shop resource scheduling via simulating random operations
- A fuzzy project scheduling approach to minimize schedule risk for product development
- Theory and practice of uncertain programming
- Uncertainty theory. An introduction to its axiomatic foundations.
- A note on chance constrained programming with fuzzy coefficients
- Project scheduling problem with stochastic activity duration times
- A genetic algorithm approach for the time-cost trade-off in PERT networks
- Chance-Constrained Programming
- A fuzzy set approach to activity scheduling for product development
- Critical-Path Planning and Scheduling: Mathematical Basis
- Critical path planning under uncertainty
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Solving the Project Time/Cost Tradeoff Problem Using the Minimal Cut Concept
- A Stochastic Branch-and-Bound Approach to Activity Crashing in Project Management
- Fuzzy sets
- A Simple CPM Time-Cost Tradeoff Algorithm
- Uncertainty modelling in software development projects (With case study)