Job-shop resource scheduling via simulating random operations
From MaRDI portal
Publication:1404663
DOI10.1016/S0378-4754(97)00074-8zbMath1017.90512MaRDI QIDQ1404663
Aharon Gonik, Dimitri Golenko-Ginzburg
Publication date: 21 August 2003
Published in: Mathematics and Computers in Simulation (Search for Journal in Brave)
Related Items
Robust optimization models for project scheduling with resource availability cost ⋮ Resource constrained scheduling simulation model for alternative stochastic network projects. ⋮ A class of multi-objective equilibrium chance maximization model with twofold random phenomenon and its application to hydropower station operation ⋮ A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project ⋮ New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing ⋮ New fuzzy models for time-cost trade-off problem
Cites Work
- On the optimal order of M machines in tandem
- Scheduling Stochastic Jobs with a Two-Point Distribution on Two Parallel Machines
- Stochastic Scheduling with Release Dates and Due Dates
- Scheduling jobs with stochastically ordered processing times on parallel machines to minimize expected flowtime
- The “Largest Variance First” Policy in Some Stochastic Scheduling Problems
- Scheduling jobs by stochastic processing requirements on parallel machines to minimize makespan or flowtime
- Minimizing the Expected Makespan in Stochastic Flow Shops
- Scheduling of stochastic tasks on two parallel processors