(37)- Computing latest starting times of activities in interval-valued networks with minimal time lags
- Scheduling arrivals to a production system in a fuzzy environment
- A fuzzy-linguistic approach to a multi-criteria sequencing problem
- FUN: a dynamic method for scheduling problems
- Generalized path-finding algorithms on semirings and the fuzzy shortest path problem.
- On computing the latest starting times and floats of activities in a network with imprecise durations
- Survey on fuzzy shop scheduling
- Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge
- Fuzzy temporal characteristics of operations for project management on the network models basis
- On latest starting times and floats in activity networks with ill-known durations
- Parallel machine scheduling models with fuzzy processing times
- Application of fuzzy distributions on project management
- Solving project scheduling problem with the philosophy of fuzzy random programming
- Evolutionary tabu search for flexible due-date satisfaction in fuzzy job shop scheduling
- Project scheduling problem with mixed uncertainty of randomness and fuzziness
- Chance-constrained model for uncertain job shop scheduling problem
- A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project
- Parallel tabu search algorithm with uncertain data for the flexible job shop problem
- A New Approach to Find Project Characteristics and Multiple Possible Critical Paths in a Fuzzy Project Network
- A cooperative co-evolutionary particle swarm optimiser based on a niche sharing scheme for the flow shop scheduling problem under uncertainty
- Maximum and minimum between fuzzy symbols in non-interactive and weakly non-interactive situations
- Critical path analysis in the network with fuzzy activity times
- The computational complexity of the criticality problems in a network with interval activity times
- Optimization with uncertainties: a scheduling example
- Project scheduling problem with fuzzy activity durations: a novel operational law based solution framework
- A heuristic method for RCPSP with fuzzy activity times
- Criticality analysis of activity networks under interval uncertainty
- Project management using network analysis in fuzzy environment
- Solving supply chain scheduling problem using Fermatean fuzzy numbers
- A path enumeration approach for the analysis of critical activities in fuzzy networks
- Bi-level multiple mode resource-constrained project scheduling problems under hybrid uncertainty
- Using fuzzy sets in operational research
- Developing a heuristic algorithm for order production planning using network models under uncertainty conditions
- Job sequencing with fuzzy processing times
- Fuzzy project scheduling problem and its hybrid intelligent algorithm
- New fuzzy models for time-cost trade-off problem
- On the latest starting times and criticality of activities in a network with imprecise durations