Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns
From MaRDI portal
Publication:6588469
Recommendations
- Tabu search and simulated annealing for resource-constrained multi-project scheduling to minimize maximal cash flow gap
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
- Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective
- Simulated annealing and tabu search for multi-mode project payment scheduling
- Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap
Cites work
- A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing
- A decomposition approach to multi-project scheduling
- A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows
- A genetic algorithm for the resource constrained multi-project scheduling problem
- A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem
- A multicriteria heuristic method to improve resource allocation in multiproject scheduling
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- A random generator of resource-constrained multi-project network problems
- A simulated annealing algorithm for resource constrained project scheduling problems
- A two stage search heuristic for scheduling payments in projects
- Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling
- Capital- and resource-constrained project scheduling with net present value optimization
- Cash Flows in Networks
- Client‐contractor bargaining on net present value in project scheduling with limited resources
- Discrete-continuous project scheduling with discounted cash flows - a tabu search approach
- Equation of state calculations by fast computing machines
- Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows
- Improving simulated annealing with variable neighborhood search to solve the resource-constrained scheduling problem
- Interactive analysis of multiple-criteria project scheduling problems
- Managing and modelling general resource transfers in (multi-)project scheduling
- Metaheuristics for multi-mode capital-constrained project payment scheduling
- Multi-mode project payment scheduling problems with bonus-penalty structure
- Multi-mode resource constrained multi-project scheduling and resource portfolio problem
- Multi-project scheduling with two-stage decomposition
- Multi-Project Scheduling: Categorization of Heuristic Rules Performance
- New summary measures and datasets for the multi-project scheduling problem
- Project network models with discounted cash flows a guided tour through recent developments
- Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics
- Resource-constrained project scheduling by simulated annealing
- Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach
- Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair-wise swap algorithm
- Scheduling projects to maximize net present value -- the case of time-dependent, contingent cash flows
- Scheduling subject to resource constraints: Classification and complexity
- Simulated annealing and tabu search for multi-mode project payment scheduling
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
- Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective
- Simulated annealing for multi-mode resource-constrained project scheduling
- Tabu search and simulated annealing for resource-constrained multi-project scheduling to minimize maximal cash flow gap
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty
- Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times
- Using metaheuristics in multiobjective resource constrained project scheduling
- Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap
This page was built for publication: Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6588469)