The payment scheduling problem

From MaRDI portal
Publication:5666387

DOI10.1002/nav.3800190110zbMath0252.90034OpenAlexW2078628879MaRDI QIDQ5666387

R. C. Grinold

Publication date: 1972

Published in: Naval Research Logistics Quarterly (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1002/nav.3800190110




Related Items (31)

Scheduling a project to maximize its net present value: An integer programming approachEarly-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approachA scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flowsA tabu search procedure for the resource constrained project scheduling problem with discounted cash flowsA genetic algorithm for resource investment problem with discounted cash flowsAn optimization model for stochastic project networks with cash flowsKnowledge integration using problem spaces: A study in resource-constrained project schedulingA comparison of stochastic scheduling rules for maximizing project net present valueResource-constrained project scheduling: A survey of recent developments.An agency perspective for multi-mode project scheduling with time/cost trade-offsThe project scheduling problem with irregular starting time costsMaximizing the expected net present value in a project with uncertain cash flowsMaximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedureMulti-mode project payment scheduling problems with bonus-penalty structureSimulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment modelsProject bidding under deterministic and probabilistic activity durationsThe scheduling of activities to maximize the net present value of projectsCP methods for scheduling and routing with~time-dependent task costsClient‐contractor bargaining on net present value in project scheduling with limited resourcesResource-constrained project scheduling: Notation, classification, models, and methodsProgress payments in project scheduling problems.An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relationsA parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relationsProject network models with discounted cash flows a guided tour through recent developmentsScheduling projects to maximize net present value -- the case of time-dependent, contingent cash flowsPSPLIB -- a project scheduling problem libraryA priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penaltiesMaximizing the net present value of a project under uncertaintySimulated annealing and tabu search for multi-mode project payment schedulingA branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relationsProcedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints



Cites Work


This page was built for publication: The payment scheduling problem