Scheduling a project to maximize its net present value: An integer programming approach

From MaRDI portal
Publication:2366079


DOI10.1016/0377-2217(93)90176-NzbMath0769.90053MaRDI QIDQ2366079

James H. Patterson, F. Brian Talbot, Kum Khiong Yang

Publication date: 29 June 1993

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(93)90176-n


90C10: Integer programming

90B35: Deterministic scheduling theory in operations research


Related Items

A constraint-based perspective in resource constrained project scheduling, Work Package Sizing and Project Performance, A genetic algorithm for resource investment problem with discounted cash flows, An optimization model for stochastic project networks with cash flows, Financing and reliability analysis for schedules in the project calendar planning problem, A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations, A priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penalties, Simulated annealing and tabu search for multi-mode project payment scheduling, A comparison of stochastic scheduling rules for maximizing project net present value, An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations, A framework for an interactive project scheduling system under limited resources, Project network models with discounted cash flows a guided tour through recent developments, A stochastic model to control project duration and expenditure, A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows, Resource-constrained project scheduling: A survey of recent developments., Which fuzzy ranking method is best for maximizing fuzzy net present value?, Investment decisions and sensitivity analysis: NPV-consistency of rates of return, Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models, Progress payments in project scheduling problems., Solving the resource constrained project scheduling problem with optimization subroutine library, The project scheduling problem with irregular starting time costs, On scheduling credited projects, Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times, Client‐contractor bargaining on net present value in project scheduling with limited resources



Cites Work