An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints

From MaRDI portal
Publication:5630815

DOI10.1287/mnsc.17.12.B803zbMath0224.90030MaRDI QIDQ5630815

George E. Heidorn, Edward W. Davis

Publication date: 1971

Published in: Management Science (Search for Journal in Brave)




Related Items (27)

Heuristics for scheduling resource-constrained projects in MPM networksAn exact algorithm for an integrated project staffing problem with a homogeneous workforceScheduling a project to maximize its net present value: An integer programming approachHierarchical models for multi-project planning and schedulingTwo level heuristic for the resource constrained scheduling problemSemi-active, active, and non-delay schedules for the resource-constrained project scheduling problemOn the measurement of complexity in activity networksResource-constrained project scheduling: A survey of recent developments.New representation to reduce the search space for the resource-constrained project scheduling problemConsidering project management activities for engineering design groupsA neurogenetic approach for the resource-constrained project scheduling problemKapazitätsplanung in Netzwerken. Ein Überblick über neuere Modelle und Verfahren. (Resource-constrained project planning in networks. A survey on new models and methods)Some efficient multi-heuristic procedures for resource-constrained project schedulingComputational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problemsA high-performance exact method for the resource-constrained project scheduling problemResource-constrained project scheduling: Notation, classification, models, and methodsSerial and parallel resource-constrained project scheduling methods revisited: Theory and computationAn efficient optimal solution procedure for the preemptive resource-constrained project scheduling problemA multiple-tree search procedure for the resource-constrained project scheduling problemProject scheduling with resource constraints: A branch and bound approach. Note by Frederik KaeferA genetic algorithm for multi-mode resource constrained project scheduling problemAn interactive decision support system for the resource constrained scheduling problemPSPLIB -- a project scheduling problem libraryPreselective strategies for the optimization of stochastic project networks under resource constraintsEnvironmental regulation in project-based industriesResource-constrained project scheduling by simulated annealingA comparative study of computational procedures for the resource constrained project scheduling problem




This page was built for publication: An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints