A \(0-1\) goal programming model for scheduling multiple maintenance projects at a copper mine
From MaRDI portal
Publication:1331564
DOI10.1016/0377-2217(94)90015-9zbMath0925.90219OpenAlexW1989951929MaRDI QIDQ1331564
Publication date: 8 November 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)90015-9
Deterministic scheduling theory in operations research (90B35) Reliability, availability, maintenance, inspection in operations research (90B25) Case-oriented studies in operations research (90B90)
Related Items
Resource allocation in multi-class dynamic PERT networks with finite capacity, Multi-criteria decision analysis with goal programming in engineering, management and social sciences: a state-of-the art review, Resource-constrained multi-project scheduling problem: a survey, Resource allocation in dynamic PERT networks with finite capacity, A learning-based optimization approach to multi-project scheduling, A survey of variants and extensions of the resource-constrained project scheduling problem
Cites Work
- Some efficient multi-heuristic procedures for resource-constrained project scheduling
- Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
- Project Scheduling with Continuously-Divisible, Doubly Constrained Resources
- Maximizing Submodular Set Functions: Formulations and Analysis of Algorithms
- Multi-Project Scheduling: Categorization of Heuristic Rules Performance
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Optimal maintenance headcount allocation: an application of Chebyshev Goal Programming
- Resource-constrained Project Scheduling — The State of the Art