Resource-constrained Project Scheduling — The State of the Art
From MaRDI portal
Publication:5650498
DOI10.1057/jors.1972.48zbMath0238.90031OpenAlexW2029549265MaRDI QIDQ5650498
Publication date: 1972
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://lirias.kuleuven.be/handle/123456789/118187
Related Items (8)
A \(0-1\) goal programming model for scheduling multiple maintenance projects at a copper mine ⋮ Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling ⋮ Resource-constrained project scheduling: A survey of recent developments. ⋮ Considering project management activities for engineering design groups ⋮ Some efficient multi-heuristic procedures for resource-constrained project scheduling ⋮ An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem ⋮ Resource-constrained project scheduling by simulated annealing ⋮ Improved formulations and new valid inequalities for a hybrid flow shop problem with time-varying resources and chaining time-lag
This page was built for publication: Resource-constrained Project Scheduling — The State of the Art