Multiobjective network scheduling with efficient use of renewable and nonrenewable resources

From MaRDI portal
Publication:1150305

DOI10.1016/0377-2217(81)90348-9zbMath0455.90049OpenAlexW1973812366MaRDI QIDQ1150305

Slowinski, Roman

Publication date: 1981

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(81)90348-9



Related Items

A \(0-1\) goal programming model for scheduling multiple maintenance projects at a copper mine, Hierarchical models for multi-project planning and scheduling, A tabu-search heuristic for the flexible-resource flow shop scheduling problem, Constrained multi-project planning problems: A Lagrangean decomposition approach, MIPS: A DSS for multiobjective interactive project scheduling, DSS for multiobjective project scheduling, A local constraint based analysis approach to project scheduling under general resource constraints, Trade-off balancing in scheduling for flow shop production and perioperative processes, Scheduling jobs with release dates and tails on identical machines to minimize the makespan, A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems, An effective branch-and-price algorithm for the preemptive resource constrained project scheduling problem based on minimal interval order enumeration, Integration of electromagnetism with multi-objective evolutionary algorithms for RCPSP, New trends in machine scheduling, A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows, Allocation of partially renewable resources: Concept, capabilities, and applications, Resource-constrained job scheduling with recyclable resources, Multiple and bicriteria scheduling: A literature survey, Dynamic resource allocation and collaborative scheduling in R\&D and manufacturing processes of high-end equipment with budget constraint, Project scheduling with finite or infinite number of activity processing modes -- a survey, Project scheduling problem with fuzzy activity durations: a novel operational law based solution framework, Resource constrained routing and scheduling: review and research prospects, A survey of results for sequencing problems with controllable processing times, Scheduling subject to nonrenewable-resource constraints, Multi-attribute assignment of trains to departures in rolling stock management. Multi-attribute assignment of trains to departures in rolling stock management. A contribution to the EURO/ROADEF 2014 challenge, An iterative scheduling technique for resource-constrained project scheduling, Application of the ellipsoid method in an interactive procedure for multicriteria linear programming, An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances, A constraint-based perspective in resource constrained project scheduling, Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems, A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem, Kapazitätsplanung in Netzwerken. Ein Überblick über neuere Modelle und Verfahren. (Resource-constrained project planning in networks. A survey on new models and methods), A multicriteria fuzzy linear programming method for water supply system development planning, Some efficient multi-heuristic procedures for resource-constrained project scheduling, Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems, A survey of variants and extensions of the resource-constrained project scheduling problem, A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes, Job-shop scheduling with resource-time models of operations, Project network models with discounted cash flows a guided tour through recent developments, An interactive decision support system for the resource constrained scheduling problem, PSPLIB -- a project scheduling problem library, A model to optimize project resource allocation by construction of a balanced histogram, Interactive analysis of multiple-criteria project scheduling problems, Preemptive scheduling of independent jobs on parallel machines subject to financial constraints, Resource-constrained project scheduling by simulated annealing, Resource-constrained project scheduling through the goal programming model: integration of the manager's preferences



Cites Work