A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems
DOI10.1016/0377-2217(88)90251-2zbMath0633.90024OpenAlexW1980479356MaRDI QIDQ1096529
Mario I. Norbis, James MacGregor Smith
Publication date: 1988
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(88)90251-2
schedulingheuristicplanningmultiple criteria programmingcontrollingmanufacturing operationsmulti- level, multi-priority schemapolynomial time and space complexityResource Constrained Scheduling Problem
Analysis of algorithms and problem complexity (68Q25) Numerical mathematical programming methods (65K05) Sensitivity, stability, parametric optimization (90C31) Production models (90B30)
Related Items (7)
Cites Work
- New directions in scheduling theory
- Solving a bicriterion scheduling problem
- Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
- Two level heuristic for the resource constrained scheduling problem
- On the interactive solution to a multicriteria scheduling problem
- A Review of Production Scheduling
This page was built for publication: A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems