Multiple and bicriteria scheduling: A literature survey

From MaRDI portal
Publication:1130028

DOI10.1016/0377-2217(93)E0140-SzbMath0913.90178OpenAlexW1990848197MaRDI QIDQ1130028

Amit Nagar, Jorge Haddock, Sunderesh S. Heragu

Publication date: 1995

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(93)e0140-s



Related Items

Minimizing the weighted number of tardy jobs on multiple machines: a review, Non-permutation flowshop scheduling problem with minimal and maximal time lags: theoretical study and heuristic, On the flexibility of a decision theory-based heuristic for single machine scheduling, Makespan minimization subject to flowtime optimality on identical parallel machines, A multi-criteria approach for scheduling semiconductor wafer fabrication facilities, Single machine scheduling to minimize total weighted earliness subject to minimal number of tardy jobs, \(K\)-PPM: a new exact method to solve multi-objective combinatorial optimization problems, Bi-objective resource-constrained project scheduling with robustness and makespan criteria, An exact parallel method for a bi-objective permutation flowshop problem, On optimizing a bi-objective flowshop scheduling problem in an uncertain environment, Parallel partitioning method (PPM): A new exact method to solve bi-objective problems, A heuristic approach to bicriteria scheduling, A combined branch-and bound and genetic algorithm based approach for a flowshop scheduling problem, On Lagrangian relaxation for constrained maximization and reoptimization problems, A survey of single machine scheduling to minimize weighted number of tardy jobs, On the complexity of bi-criteria scheduling on a single batch processing machine, The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure., Bi-criteria scheduling on a single parallel-batch machine, Multiobjective bed management considering emergency and elective patient flows, Unnamed Item, Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problem, Heuristic for a new multiobjective scheduling problem, Bicriterion scheduling with equal processing times on a batch processing machine, On the Integration of Theoretical Single-Objective Scheduling Results for Multi-objective Problems, Lexicographic optimization of a permutation flow shop scheduling problem with time lag constraints, A new heuristic for \(m\)-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness, Minimizing makespan subject to minimum flowtime on two identical parallel machines, Multicriteria scheduling problems: a survey, A parallel multiple reference point approach for multi-objective optimization, A grasp algorithm for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness, Two-machine open shop scheduling with secondary criteria, Minimizing total completion time and total deviation of job completion times from a restrictive due-date, Minimizing flowtime subject to optimal makespan on two identical parallel machines, A multicriteria approach to timeout collaboration protocol, Solving a bicriteria scheduling problem on unrelated parallel machines occurring in the glass bottle industry, Local search heuristics for two-stage flow shop problems with secondary criterion, Bicriteria hierarchical optimization of two-machine flow shop scheduling problem with time-dependent deteriorating jobs, Flowshop-scheduling problems with makespan criterion: a review, A bicriteria approach to the two-machine flow shop scheduling problem, A MULTI-OBJECTIVE RISK-BASED FRAMEWORK FOR MISSION CAPABILITY PLANNING, BICRITERIA SCHEDULING ON SINGLE-MACHINE WITH INVENTORY OPERATIONS, New solution methods for single machine bicriteria scheduling problem: Minimization of average flowtime and number of tardy jobs, Generating efficient schedules for identical parallel machines involving flow-time and tardy jobs, Genetic local search for multi-objective flowshop scheduling problems, Bicriteria train scheduling for high-speed passenger railroad planning applications, Minimizing makespan subject to minimum total flow-time on identical parallel machines, Pareto and scalar bicriterion optimization in scheduling deteriorating jobs, A bicriteria two-machine permutation flowshop problem, Efficient heuristics for flowshop sequencing with the objectives of makespan and flowtime minimisation, An ant colony optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problem, Scheduling continuous casting of aluminum using a multiple objective ant colony optimization metaheuristic, Using genetic algorithms for single-machine bicriteria scheduling problems



Cites Work