Lexicographic optimization of a permutation flow shop scheduling problem with time lag constraints
From MaRDI portal
Publication:4921223
DOI10.1111/j.1475-3995.2012.00876.xzbMath1263.90033OpenAlexW2061140917MaRDI QIDQ4921223
Taïcir Loukil, Emna Dhouib, Jacques jun. Teghem
Publication date: 23 May 2013
Published in: International Transactions in Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1111/j.1475-3995.2012.00876.x
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items
Non-permutation flowshop scheduling problem with minimal and maximal time lags: theoretical study and heuristic ⋮ Three-machine flow shop scheduling with overlapping waiting time constraints ⋮ Scatter search with path relinking for the job shop with time lags and setup times ⋮ Enhanced lower bounds and exact procedures for total completion time minimization in a two‐machine permutation flowshop with release dates ⋮ Research on m‐machine flow shop scheduling with truncated learning effects ⋮ Algorithms for a two‐machine flowshop problem with jobs of two classes ⋮ Lexicographic optimization‐based clustering search metaheuristic for the multiobjective flexible job shop scheduling problem ⋮ Scheduling for a flow shop with waiting time constraints and missing operations in semiconductor manufacturing ⋮ A genetic algorithm for a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times
Uses Software
Cites Work
- Unnamed Item
- A branch and bound algorithm to minimize the number of late jobs in a permutation flow-shop
- Multiple and bicriteria scheduling: A literature survey
- Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process
- Genetic algorithms for the two-stage bicriteria flowshop problem
- Two-machine flowshop scheduling with a secondary criterion
- Permutation flowshop scheduling problems with maximal and minimal time lags
- Multicriteria scheduling problems: a survey
- Permutation flow shops with exact time lags to minimise maximum lateness
- A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints
- Two-Stage Flowshop Scheduling Problem with Bicriteria
- Shop Problems With Two Machines and Time Lags
- Handbook of metaheuristics
- Local search heuristics for two-stage flow shop problems with secondary criterion