Non-permutation flowshop scheduling problem with minimal and maximal time lags: theoretical study and heuristic
From MaRDI portal
Publication:1615940
DOI10.1007/s10479-018-2775-5zbMath1405.90061OpenAlexW2794187668MaRDI QIDQ1615940
Taïcir Loukil, Emna Dhouib, Jacques jun. Teghem
Publication date: 31 October 2018
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-018-2775-5
heuristicsschedulingmathematical programmingtime lagslexicographic optimizationnon-permutation flowshop
Applications of mathematical programming (90C90) Mixed integer programming (90C11) Linear programming (90C05) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items
Cites Work
- Unnamed Item
- Scatter search with path relinking for the job shop with time lags and setup times
- Two simple and effective heuristics for minimizing the makespan in non-permutation flow shops
- Complexity results for flow-shop and open-shop scheduling problems with transportation delays
- Tabu search for non-permutation flowshop scheduling problem with minimizing total tardiness
- Two-machine flow shop scheduling problems with minimal and maximal delays
- A branch and bound algorithm to minimize the number of late jobs in a permutation flow-shop
- Multiple and bicriteria scheduling: A literature survey
- Permutation vs. non-permutation flow shop schedules
- Genetic algorithms for the two-stage bicriteria flowshop problem
- Benchmarks for shop scheduling problems
- Two-machine flowshop scheduling with a secondary criterion
- Upper and lower bounds for the permutation flowshop scheduling problem with minimal time lags
- Benchmarks for basic scheduling problems
- A memetic algorithm for the job-shop with time-lags
- Permutation flowshop scheduling problems with maximal and minimal time lags
- A branch and bound algorithm to minimise the total tardiness in the two-machine permutation flowshop scheduling problem with minimal time lags
- Multicriteria scheduling problems: a survey
- Two-Stage Flowshop Scheduling Problem with Bicriteria
- Shop Problems With Two Machines and Time Lags
- Lexicographic optimization of a permutation flow shop scheduling problem with time lag constraints
- Local search heuristics for two-stage flow shop problems with secondary criterion