Scheduling to minimize the weighted sum of completion times with secondary criteria
From MaRDI portal
Publication:4102901
DOI10.1002/nav.3800230111zbMath0335.90029OpenAlexW2047331937MaRDI QIDQ4102901
Publication date: 1976
Published in: Naval Research Logistics Quarterly (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.3800230111
Related Items
A bicriterion scheduling problem involving total flowtime and total tardiness, Single machine scheduling to minimize weighted earliness subject to no tardy jobs, A Branch-and-Bound approach to solve a Bicriterion Scheduling Problem involving Squared Flowtime and Maximum Tardiness, Multiple and bicriteria scheduling: A literature survey, Single machine scheduling to minimize weighted sum of completion times with secondary criterion - A branch and bound approach, An improved branch and bound algorithm for single machine scheduling with deadlines to minimize total weighted completion time., Reducibility among single machine weighted completion time scheduling problems, An algorithm for single machine sequencing with deadlines to minimize total weighted completion time, Multicriteria scheduling problems: a survey, Counting and enumeration complexity with application to multicriteria scheduling, Minimizing mean tardiness subject to unspecified minimum number tardy for a single machine, Scheduling unit processing time jobs on a single machine with multiple criteria