A Branch-and-Bound approach to solve a Bicriterion Scheduling Problem involving Squared Flowtime and Maximum Tardiness
From MaRDI portal
Publication:4297161
DOI10.1080/02522667.1994.10699185zbMATH Open0801.90066OpenAlexW2063178966MaRDI QIDQ4297161FDOQ4297161
Authors: Tapan Sen, Brian W. Scott
Publication date: 8 August 1994
Published in: Journal of Information and Optimization Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/02522667.1994.10699185
Recommendations
- Note—A Branch-and-Bound Approach to the Bicriterion Scheduling Problem Involving Total Flowtime and Range of Lateness
- A bicriterion scheduling problem involving total flowtime and total tardiness
- A Single Machine Bicriterion Scheduling Problem and an Optimizing Branch-and-Bound Procedure
- Note: Bicriteria scheduling for minimizing flow time and maximum tardiness
- Bicriterion scheduling in the two-machine flowshop
Cites Work
- Solving a bicriterion scheduling problem
- A bicriterion approach to time/cost trade-offs in sequencing
- A dual algorithm for the one-machine scheduling problem
- The Single Machine Problem with Quadratic Penalty Function of Completion Times: A Branch-and-Bound Solution
- A note on a scheduling problem with dual criteria
- A note on the extension of a result on scheduling with secondary criteria
- Note—A Branch-and-Bound Approach to the Bicriterion Scheduling Problem Involving Total Flowtime and Range of Lateness
- One machine sequencing to minimize mean flow time with minimum number tardy
- Job Shop Sequencing Problem on Two Machines with Time Lag Constraints
- Scheduling to minimize the weighted sum of completion times with secondary criteria
Cited In (2)
This page was built for publication: A Branch-and-Bound approach to solve a Bicriterion Scheduling Problem involving Squared Flowtime and Maximum Tardiness
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4297161)