An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs

From MaRDI portal
Publication:5548719

DOI10.1287/mnsc.15.1.102zbMath0164.20002OpenAlexW2010484711MaRDI QIDQ5548719

J. Michael Moore

Publication date: 1968

Published in: Management Science (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/mnsc.15.1.102




Related Items (only showing first 100 items - show all)

Single machine scheduling with assignable due datesAn ordered independence system and its applications to scheduling problemsScheduling jobs under simple linear deteriorationIncorporating preference information into multi-objective schedulingThe stochastic single machine scheduling problem with earliness and tardiness costsOnline production planning to maximize the number of on-time ordersNew algorithms for minimizing the weighted number of tardy jobs on a single machineTimetabling of sorting slots in a logistic warehouseMultitasking via alternate and shared processing: algorithms and complexitySingle-machine scheduling with trade-off between number of tardy jobs and compression costMaximizing the weighted number of just-in-time jobs in flow shop schedulingMinimizing the number of tardy jobs with stochastically-ordered processing timesMinimizing the number of late jobs in a stochastic setting using a chance constraintKnapsack-like scheduling problems, the Moore-Hodgson algorithm and the `Tower of Sets' propertySingle-machine scheduling to minimize the weighted number of early and tardy agreeable jobsFlowshop scheduling with dominant machinesScheduling unit time jobs with integer release dates to minimize the weighted number of tardy jobsScheduling on machines with variable service ratesLawler's minmax cost algorithm: optimality conditions and uncertaintyResource loading with time windowsMinimizing the weighted number of tardy jobs on a single machine with release datesBi-criteria scheduling problems: Number of tardy jobs and maximum weighted tardinessSingle machine scheduling with interfering job setsScheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobsSingle-machine scheduling with trade-off between number of tardy jobs and resource allocationPatient scheduling with periodic deteriorating maintenance on single medical deviceA binary multiple knapsack model for single machine scheduling with machine unavailabilityApproximate algorithms for the \(P\parallel C_{\max}\) problemOn single processor scheduling problems with learning dependent on the number of processed jobsSingle machine scheduling with discretely controllable processing timesMinimizing the number of tardy jobs in a permutation flowshop scheduling problem with setup times and time lags constraintsk-optimal solution sets for some polynomially solvable scheduling problemsA branch and bound algorithm to minimize the number of late jobs in a permutation flow-shopSome single-machine scheduling problems with actual time and position dependent learning effectsA survey of single machine scheduling to minimize weighted number of tardy jobsSingle processor scheduling with job values depending on their completion timesMinimizing the number of tardy jobs for \(m\) parallel machinesSingle machine scheduling problems with subcontracting optionsMultiple and bicriteria scheduling: A literature surveyMinimizing late jobs in the general one machine scheduling problemAlgorithms for some maximization scheduling problems on a single machineTwo-person cooperative games on scheduling problems in outpatient pharmacy dispensing processScheduling satellite launch missions: an MILP approachMulti-criteria scheduling: an agent-based approach for expert knowledge integrationA study of single-machine scheduling problem to maximize throughputA note on reverse scheduling with maximum lateness objectiveComplexity results for scheduling chains on a single machineIdentical parallel machines vs. unit-time shops and preemptions vs. chains in scheduling complexityOn bilevel machine scheduling problemsMinimizing maximum earliness and number of tardy jobs in the single machine scheduling problemOn the complexity of bi-criteria scheduling on a single batch processing machineNew dominance rules and exploration strategies for the \(1|r _{i}|\sum U _{i }\) scheduling problemAlgorithms and complexity analysis for robust single-machine scheduling problemsGenetic algorithms to minimize the weighted number of late jobs on a single machine.Minimizing the weighted number of tardy jobs on a two-machine flow shop.Single machine scheduling to minimize the number of late jobs under uncertainty.A note on ``Single-machine scheduling with general learning functionsA note on the maximum number of on-time jobs on parallel identical machines.A dynamic programming algorithm for preemptive scheduling of a single machine to minimize the number of late jobsErratum to ``Single machine past-sequence-dependent setup times scheduling with general position-dependent and time-dependent learning effects [Appl. Math. Modelling 35 (2011) 1388-1395] ⋮ Minimizing the number of late jobs on a single machine under due date uncertaintyOn the complexity of generalized due date scheduling problemsPerformance guarantees for a scheduling problem with common stepwise job payoffsA note: Maximizing the weighted number of just-in-time jobs on a proportionate flowshopA note: minimizing maximum earliness on a proportionate flowshopSingle-machine scheduling against due dates with past-sequence-dependent setup timesPareto optimization scheduling with two competing agents to minimize the number of tardy jobs and the maximum costMinimizing the number of late jobs for the permutation flowshop problem with secondary resourcesSingle machine sequencing with nonlinear multicriteria cost functions: An application of generalized dynamic programmingScheduling problem with multi-purpose parallel machinesComplexity of single machine scheduling problems under scenario-based uncertaintyBicriterion scheduling with equal processing times on a batch processing machineFuzzy job-shop scheduling problems: a reviewSingle-machine scheduling under the job rejection constraintSingle machine past-sequence-dependent setup times scheduling with general position-dependent and time-dependent learning effectsSequencing a single machine with due dates and deadlines: An ILP-based approach to solve very large instancesMinimizing number of tardy jobs on a batch processing machine with incompatible job familiesGenetic algorithm for bi-criteria single machine scheduling problem of minimizing maximum earliness and number of tardy jobsComplexity results for flow shop problems with synchronous movementMinimizing the number of tardy jobs in the flowshop problem with operation and resource flexibilityIsomorphic scheduling problemsLocal search heuristics for single-machine scheduling with batching to minimize the number of late jobsMinimizing mean tardiness subject to unspecified minimum number tardy for a single machineMinimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveriesSingle machine scheduling subject to deadlines and resource dependent processing timesA note on a single machine scheduling problem with generalized total tardiness objective functionPriority algorithms for the subset-sum problemParallel machine scheduling with a common serverSingle machine scheduling problems with position-dependent processing timesParallel machine scheduling with splitting jobsThe counting complexity of a simple scheduling problemScheduling jobs under decreasing linear deteriorationNew solution methods for single machine bicriteria scheduling problem: Minimization of average flowtime and number of tardy jobsAn O\((n^4)\) algorithm for preemptive scheduling of a single machine to minimize the number of late jobsParallel machine scheduling to minimize costs for earliness and number of tardy jobsMinimizing the number of late jobs on unrelated machinesSingle-machine scheduling to minimize earliness and number of tardy jobsAn optimal scheduling algorithm for preemptable real-time tasksMinimizing the weighted number of tardy jobs and maximum tardiness in relocation problem with due date constraintsThe coordination of scheduling and batch deliveries




This page was built for publication: An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs