A note on the maximum number of on-time jobs on parallel identical machines.
From MaRDI portal
Publication:1422366
DOI10.1016/S0305-0548(02)00084-9zbMATH Open1039.90016OpenAlexW2017215554MaRDI QIDQ1422366FDOQ1422366
Publication date: 14 February 2004
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0305-0548(02)00084-9
Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Cites Work
- Title not available (Why is that?)
- Title not available (Why is that?)
- An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
- Complexity results for scheduling chains on a single machine
- Single machine scheduling to minimize the number of early and tardy jobs
- Preemptive Scheduling of Two Uniform Machines to Minimize the Number of Late Jobs
Cited In (4)
- A quadratic time algorithm to maximize the number of just-in-time jobs on identical parallel machines
- Fixed interval scheduling: models, applications, computational complexity and algorithms
- Minimizing the weighted number of tardy jobs on multiple machines: a review
- Models and algorithms for energy-efficient scheduling with immediate start of jobs
Recommendations
- A quadratic time algorithm to maximize the number of just-in-time jobs on identical parallel machines π π
- Scheduling of parallel identical machines to maximize the weighted number of just-in-time jobs π π
- Maximizing weighted number of just-in-time jobs on unrelated parallel machines π π
- On the complexity of scheduling problems with a fixed number of parallel identical machines π π
- Minimizing maximum tardiness and number of tardy jobs on parallel machines subject to minimum flow-time π π
- Necessary and sufficient optimality conditions for scheduling unit time jobs on identical parallel machines π π
- Preemptive parallel-machine scheduling problem of maximizing the number of on-time jobs π π
- A heuristic for maximizing the number of on-time jobs on two uniform parallel machines π π
- Scheduling to maximize the weighted number of on-time jobs on parallel machines with bounded job-rejection π π
This page was built for publication: A note on the maximum number of on-time jobs on parallel identical machines.
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1422366)