A heuristic for maximizing the number of on-time jobs on two uniform parallel machines
From MaRDI portal
Publication:3423282
DOI10.1002/NAV.20161zbMATH Open1106.90033OpenAlexW2038586658MaRDI QIDQ3423282FDOQ3423282
Authors: George J. Kyparisis, C. Koulamas
Publication date: 20 February 2007
Published in: Naval Research Logistics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.20161
Recommendations
- Makespan minimization on uniform parallel machines with release times
- Analysis of a linear programming heuristic for scheduling unrelated parallel machines
- Heuristics for parallel machine scheduling with delivery times
- A note on longest processing time algorithms for the two uniform parallel machine makespan minimization problem
- Scheduling on uniform nonsimultaneous parallel machines
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cited In (5)
- A note on longest processing time algorithms for the two uniform parallel machine makespan minimization problem
- Heuristic algorithms to maximize revenue and the number of jobs processed on parallel machines
- A note on the maximum number of on-time jobs on parallel identical machines.
- A modified LPT algorithm for the two uniform parallel machine makespan minimization problem
- Makespan minimization on uniform parallel machines with release times
This page was built for publication: A heuristic for maximizing the number of on-time jobs on two uniform parallel machines