George J. Kyparisis

From MaRDI portal
(Redirected from Person:161997)



List of research outcomes

This list is not complete and representing at the moment only items from zbMATH Open and arXiv. We are working on additional sources - please check back here soon!

PublicationDate of PublicationType
Erratum to: ``Competitive two-agent scheduling and its applications
Operations Research
2024-09-05Paper
A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems
European Journal of Operational Research
2022-12-12Paper
Two-stage no-wait proportionate flow shop scheduling with minimal service time variation and optional job rejection
European Journal of Operational Research
2022-11-17Paper
New results for single-machine scheduling with past-sequence-dependent setup times and due date-related objectives
European Journal of Operational Research
2019-06-25Paper
Resale price maintenance in supply chains with general multiplicative demand
Operations Research Letters
2019-06-11Paper
The price-setting newsvendor with nonlinear salvage revenue and shortage cost
Operations Research Letters
2019-06-11Paper
New structural properties of supply chains with price-only contracts
Operations Research Letters
2019-01-15Paper
The price-setting newsvendor problem with nonnegative linear additive demand
European Journal of Operational Research
2018-05-22Paper
The three-machine proportionate open shop and mixed shop minimum makespan problems
European Journal of Operational Research
2016-10-06Paper
Two-tier equilibria for supply chains with a single manufacturer and multiple asymmetric retailers
Operations Research Letters
2014-05-15Paper
On index priority sequencing rules for scheduling with time-dependent job processing times
Operations Research Letters
2014-05-15Paper
Assembly-line scheduling with concurrent operations and parallel machines
INFORMS Journal on Computing
2012-05-30Paper
A note on equilibria for two-tier supply chains with a single manufacturer and multiple retailers
Operations Research Letters
2012-04-05Paper
A note on the classification of consumer demand functions with respect to retailer pass-through rates
European Journal of Operational Research
2011-08-09Paper
A note on the optimality of index priority rules for search and sequencing problems
Naval Research Logistics
2011-04-14Paper
A unified analysis for the single-machine scheduling problem with controllable and non-controllable variable job processing times
European Journal of Operational Research
2010-06-11Paper
A note on the effects of downstream efficiency on upstream pricing
European Journal of Operational Research
2009-12-10Paper
A modified LPT algorithm for the two uniform parallel machine makespan minimization problem
European Journal of Operational Research
2009-01-08Paper
A note on the proportionate flow shop with a bottleneck machine
European Journal of Operational Research
2008-12-02Paper
Single-machine scheduling with waiting-time-dependent due dates
European Journal of Operational Research
2008-07-21Paper
Single-machine scheduling problems with past-sequence-dependent setup times
European Journal of Operational Research
2008-01-21Paper
An improved delayed-start LPT algorithm for a partition problem on two identical parallel machines
European Journal of Operational Research
2007-12-12Paper
A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines
European Journal of Operational Research
2007-05-30Paper
A heuristic for maximizing the number of on-time jobs on two uniform parallel machines
Naval Research Logistics
2007-02-20Paper
Single-machine and two-machine flowshop scheduling with general learning functions
European Journal of Operational Research
2007-01-22Paper
A note on makespan minimization in two-stage flexible flow shops with uniform machines
European Journal of Operational Research
2006-10-27Paper
Performance guarantees for flowshop heuristics to minimize makespan
European Journal of Operational Research
2005-11-04Paper
Flexible flow shop scheduling with uniform parallel machines
European Journal of Operational Research
2005-10-17Paper
Makespan minimization on uniform parallel machines with release times
European Journal of Operational Research
2004-08-16Paper
Scheduling three-operation jobs in a two-machine flow shop to minimize makespan
Annals of Operations Research
2004-08-10Paper
Concurrent flowshop scheduling to minimize makespan.
European Journal of Operational Research
2004-05-27Paper
Single machine scheduling with release times, deadlines and tardiness objectives
European Journal of Operational Research
2002-01-13Paper
A note on weighted completion time minimization in a flexible flow shop
Operations Research Letters
2001-12-05Paper
The three-stage assembly flowshop scheduling problem
Computers & Operations Research
2001-07-23Paper
scientific article; zbMATH DE number 1300389 (Why is no real title available?)2001-02-09Paper
A note on scheduling flowshops with flexible stage ordering
European Journal of Operational Research
2001-01-01Paper
Flow shop and open shop scheduling with a critical machine and two operations per job
European Journal of Operational Research
2000-12-21Paper
Scheduling on uniform parallel machines to minimize maximum lateness
Operations Research Letters
2000-11-22Paper
scientific article; zbMATH DE number 1462947 (Why is no real title available?)2000-06-21Paper
Open shop scheduling with makespan and total completion time criteria
Computers & Operations Research
2000-02-15Paper
Project selection with discounted returns and multiple constraints
European Journal of Operational Research
1999-02-22Paper
A decision model for interdependent information system project selection
European Journal of Operational Research
1998-10-07Paper
Open shop scheduling with maximal machines
Discrete Applied Mathematics
1998-01-26Paper


Research outcomes over time


This page was built for person: George J. Kyparisis