A note on weighted completion time minimization in a flexible flow shop
From MaRDI portal
Publication:5949902
DOI10.1016/S0167-6377(01)00072-4zbMath0981.90025MaRDI QIDQ5949902
Kyparisis, George J., Christos P. Koulamas
Publication date: 5 December 2001
Published in: Operations Research Letters (Search for Journal in Brave)
90B35: Deterministic scheduling theory in operations research
90C59: Approximation methods and heuristics in mathematical programming
Related Items
Hybrid Flow Shop Scheduling: Heuristic Solutions and LP-Based Lower Bounds, Using the gravitational emulation local search algorithm to solve the multi-objective flexible dynamic job shop scheduling problem in small and medium enterprises, The hybrid flow shop scheduling problem, Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective, Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problem
Cites Work
- Some results of the worst-case analysis for flow shop scheduling
- Scheduling with Deadlines and Loss Functions
- Worst Case Bound of an LRF Schedule for the Mean Weighted Flow-Time Problem
- The Complexity of Flowshop and Jobshop Scheduling
- Scheduling to minimize total weighted completion time: Performance guarantees of LP-based heuristics and lower bounds
- Scheduling independent tasks to reduce mean finishing time
- Unnamed Item
- Unnamed Item