Publication | Date of Publication | Type |
---|
A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems | 2022-12-12 | Paper |
Two-stage no-wait proportionate flow shop scheduling with minimal service time variation and optional job rejection | 2022-11-17 | Paper |
New results for scheduling to minimize tardiness on one machine with rejection and related problems | 2021-12-13 | Paper |
The proportionate flow shop total tardiness problem | 2020-05-07 | Paper |
Three-stage ordered flow shops with either synchronous flow, blocking or no-idle machines | 2020-03-10 | Paper |
The evolution of schematic representations of flow shop scheduling problems | 2020-03-06 | Paper |
Analysis of flow shop scheduling anomalies | 2019-09-09 | Paper |
New results for single-machine scheduling with past-sequence-dependent setup times and due date-related objectives | 2019-06-25 | Paper |
The price-setting newsvendor with nonlinear salvage revenue and shortage cost | 2019-06-11 | Paper |
Resale price maintenance in supply chains with general multiplicative demand | 2019-06-11 | Paper |
Scheduling research and the first decade of NRLQ: A historical perspective | 2019-05-02 | Paper |
On equivalence between the proportionate flow shop and single‐machine scheduling problems | 2019-05-02 | Paper |
A note on combined job selection and sequencing problems | 2019-03-26 | Paper |
Review of the ordered and proportionate flow shop scheduling research | 2019-03-05 | Paper |
New structural properties of supply chains with price-only contracts | 2019-01-15 | Paper |
A constraint generation approach for two-machine shop problems with jobs selection | 2018-05-25 | Paper |
The price-setting newsvendor problem with nonnegative linear additive demand | 2018-05-22 | Paper |
Minimizing the number of tardy jobs in two-machine settings with common due date | 2017-10-17 | Paper |
The proportionate two-machine no-wait job shop scheduling problem | 2016-10-07 | Paper |
The three-machine proportionate open shop and mixed shop minimum makespan problems | 2016-10-06 | Paper |
A note on scheduling problems with competing agents and earliness minimization objectives | 2016-10-06 | Paper |
The two-machine no-wait general and proportionate open shop makespan problem | 2016-06-23 | Paper |
Erratum—One Machine Sequencing to Minimize Total Tardiness: A Fourth Theorem for Emmons | 2015-11-20 | Paper |
A Constraint Generation Approach for the Two-Machine Flow Shop Problem with Jobs Selection | 2015-10-16 | Paper |
A note on the complexity of scheduling problems with linear job deterioration | 2015-06-22 | Paper |
Proportionate flow shop: New complexity results and models with due date assignment | 2015-05-06 | Paper |
On index priority sequencing rules for scheduling with time-dependent job processing times | 2014-05-15 | Paper |
Two-tier equilibria for supply chains with a single manufacturer and multiple asymmetric retailers | 2014-05-15 | Paper |
An \(O(n^{2})\) algorithm for the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines | 2012-12-29 | Paper |
A note on minimizing the sum of quadratic completion times on two identical parallel machines | 2012-10-23 | Paper |
Assembly-Line Scheduling with Concurrent Operations and Parallel Machines | 2012-05-30 | Paper |
A note on equilibria for two-tier supply chains with a single manufacturer and multiple retailers | 2012-04-05 | Paper |
A note on the classification of consumer demand functions with respect to retailer pass-through rates | 2011-08-09 | Paper |
A note on the optimality of index priority rules for search and sequencing problems | 2011-04-14 | Paper |
A note on single-machine scheduling with job-dependent learning effects | 2010-09-09 | Paper |
A unified analysis for the single-machine scheduling problem with controllable and non-controllable variable job processing times | 2010-06-11 | Paper |
A faster algorithm for a due date assignment problem with tardy jobs | 2010-05-07 | Paper |
A note on the effects of downstream efficiency on upstream pricing | 2009-12-10 | Paper |
The single-machine total tardiness scheduling problem: review and extensions | 2009-11-17 | Paper |
A modified LPT algorithm for the two uniform parallel machine makespan minimization problem | 2009-01-08 | Paper |
A faster fully polynomial approximation scheme for the single-machine total tardiness problem | 2008-12-02 | Paper |
A note on the proportionate flow shop with a bottleneck machine | 2008-12-02 | Paper |
Single-machine scheduling with waiting-time-dependent due dates | 2008-07-21 | Paper |
Single-machine scheduling problems with past-sequence-dependent setup times | 2008-01-21 | Paper |
An improved delayed-start LPT algorithm for a partition problem on two identical parallel machines | 2007-12-12 | Paper |
A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines | 2007-05-30 | Paper |
A heuristic for maximizing the number of on-time jobs on two uniform parallel machines | 2007-02-20 | Paper |
Single-machine and two-machine flowshop scheduling with general learning functions | 2007-01-22 | Paper |
A note on makespan minimization in two-stage flexible flow shops with uniform machines | 2006-10-27 | Paper |
Performance guarantees for flowshop heuristics to minimize makespan | 2005-11-04 | Paper |
Flexible flow shop scheduling with uniform parallel machines | 2005-10-17 | Paper |
Makespan minimization on uniform parallel machines with release times | 2004-08-16 | Paper |
Scheduling three-operation jobs in a two-machine flow shop to minimize makespan | 2004-08-10 | Paper |
Concurrent flowshop scheduling to minimize makespan. | 2004-05-27 | Paper |
Real-Time Vision-Based System for Textile Fabric Inspection | 2003-03-19 | Paper |
Single machine scheduling with release times, deadlines and tardiness objectives | 2002-01-13 | Paper |
A note on weighted completion time minimization in a flexible flow shop | 2001-12-05 | Paper |
The three-stage assembly flowshop scheduling problem | 2001-07-23 | Paper |
A new constructive heuristic for the flowshop scheduling problem | 2001-03-22 | Paper |
https://portal.mardi4nfdi.de/entity/Q4248926 | 2001-02-09 | Paper |
A note on scheduling flowshops with flexible stage ordering | 2001-01-01 | Paper |
Flow shop and open shop scheduling with a critical machine and two operations per job | 2000-12-21 | Paper |
Scheduling on uniform parallel machines to minimize maximum lateness | 2000-11-22 | Paper |
https://portal.mardi4nfdi.de/entity/Q4487091 | 2000-06-21 | Paper |
Open shop scheduling with makespan and total completion time criteria | 2000-02-15 | Paper |
Throughput-dependent periodic maintenance policies for general production units | 2000-01-11 | Paper |
Simultaneous determination of the cutting speed and lot size values in machining systems | 1999-12-13 | Paper |
Single-machine scheduling with time windows and earliness/tardiness penalties | 1999-02-22 | Paper |
Machining economics with machine interference considerations | 1998-12-03 | Paper |
Application of ELSP solution techniques to the deterministic robotic scheduling problem | 1998-12-02 | Paper |
Optimal solutions for the machining economics problem with stochastically distributed tool lives | 1998-10-18 | Paper |
A guaranteed accuracy shifting bottleneck algorithm for the two-machine flowshop total tardiness problem | 1998-09-27 | Paper |
Part selection and tool allocation in discrete parts manufacturing | 1998-04-02 | Paper |
Open shop scheduling with maximal machines | 1998-01-26 | Paper |
Maximizing the weighted number of on-time jobs in single machine scheduling with time windows | 1997-09-28 | Paper |
Decomposition and hybrid simulated annealing heuristics for the parallel-machine total tardiness problem | 1997-08-05 | Paper |
A total tardiness problem with preprocessing included | 1997-01-21 | Paper |
Scheduling two parallel semiautomatic machines to minimize machine interference | 1997-01-06 | Paper |
https://portal.mardi4nfdi.de/entity/Q4885615 | 1996-08-22 | Paper |
A note on finite replenishment inventory systems with continuous deterministic demand | 1996-06-16 | Paper |
Machining economics with phase-type distributed tool lives and periodic maintenance control | 1996-05-30 | Paper |
The Total Tardiness Problem: Review and Extensions | 1995-11-09 | Paper |
Lot size variability effects on manufacturing lead time | 1994-10-26 | Paper |
A heuristic for the single machine tardiness problem | 1994-02-28 | Paper |
Optimal production strategies for announced unit cost increases | 1993-10-11 | Paper |
Design of tool magazine and operational areas for a multi-tool machine | 1993-04-01 | Paper |
Exact Expressions for the First Two Moments of Job Flow Time in a Job Shop | 1993-01-17 | Paper |
A bi-criterion algorithm for minimizing machine interference and reducing job waiting time | 1993-01-16 | Paper |
A stochastic model for a machining cell with tool failure and tool replacement considerations | 1992-10-05 | Paper |
Simultaneous determination of optimal machining conditions and tool replacement policies in constrained machining economics problems by geometric programming | 1991-01-01 | Paper |
Job flow-time in a job shop subject to machine breakdowns with applications in modelling job shop in-process inventories | 1990-01-01 | Paper |
Optimal lot-sizing with some defective output and learning | 1990-01-01 | Paper |
Optimal buffer space size in two-stage machining systems with Markovian or non-Markovian tool life processes | 1989-01-01 | Paper |