scientific article; zbMATH DE number 1462947
From MaRDI portal
Publication:4487091
DOI10.1002/(SICI)1520-6750(200004)47:3%3C259::AID-NAV5%3E3.0.CO;2-KzbMATH Open0956.90009MaRDI QIDQ4487091FDOQ4487091
Authors: George J. Kyparisis, C. Koulamas
Publication date: 21 June 2000
Title of this publication is not available (Why is that?)
Recommendations
Cites Work
- Vector Summation in Banach Space and Polynomial Algorithms for Flow Shops and Open Shops
- Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard
- Minimizing makespan in hybrid flowshops
- Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
- Branch and bound algorithm for the flow shop with multiple processors
- On the Expected Relative Performance of List Scheduling
- On some geometric methods in scheduling theory: A survey
- Probabilistic Bounds on the Performance of List Scheduling
- A Note on Heuristics of Flow-Shop Scheduling
- Title not available (Why is that?)
Cited In (11)
- Performance guarantees for flowshop heuristics to minimize makespan
- A taxonomy of flexible flow line scheduling procedures
- The hybrid flow shop scheduling problem
- Scheduling of a single crane in batch annealing process
- A note on scheduling flowshops with flexible stage ordering
- The three-stage assembly flowshop scheduling problem
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- The Asymptotic Optimality of the SPT Rule for the Flow Shop Mean Completion Time Problem
- Three-stage ordered flow shops with either synchronous flow, blocking or no-idle machines
- Flexible flow shop scheduling with uniform parallel machines
- Efficiency of the solution representations for the hybrid flow shop scheduling problem with makespan objective
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4487091)