A note on makespan minimization in two-stage flexible flow shops with uniform machines
From MaRDI portal
Publication:2433488
Recommendations
- Minimizing makespan in hybrid flowshops
- Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One Stage
- Flexible flow shop scheduling with uniform parallel machines
- A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines
- Two-stage proportionate flexible flow shop to minimize the makespan
Cites work
- scientific article; zbMATH DE number 776077 (Why is no real title available?)
- Bounds for List Schedules on Uniform Processors
- Minimizing makespan in hybrid flowshops
- Optimal two- and three-stage production schedules with set-up time included
- Scheduling algorithms for flexible flowshops: Worst and average case performance
Cited in
(4)- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage
- Two-stage proportionate flexible flow shop to minimize the makespan
- The hybrid flow shop scheduling problem
This page was built for publication: A note on makespan minimization in two-stage flexible flow shops with uniform machines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2433488)