Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage

From MaRDI portal
Publication:2248262












This page was built for publication: Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2248262)