A note on scheduling hybrid flow systems
From MaRDI portal
Publication:4252131
Recommendations
- A comparison of sequencing rules in static and dynamic hybrid flow systems
- Comparison of Scheduling Rules in a Flow Shop with Multiple Processors: A Simulation
- On the Asymptotic Optimality of the SPT Rule for the Flow Shop Average Completion Time Problem
- A survey and evaluation of static flowshop scheduling heuristics
- The Asymptotic Optimality of the SPT Rule for the Flow Shop Mean Completion Time Problem
Cited in
(5)- Some remarks about the `equivalence' of performance measures in scheduling problems
- Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage
- The hybrid flow shop scheduling problem
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- A comparison of sequencing rules in static and dynamic hybrid flow systems
This page was built for publication: A note on scheduling hybrid flow systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4252131)