A comparison of sequencing rules in static and dynamic hybrid flow systems
From MaRDI portal
Publication:4252124
DOI10.1080/002075497195371zbMATH Open0942.90519OpenAlexW2106350294MaRDI QIDQ4252124FDOQ4252124
Authors:
Publication date: 21 August 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075497195371
Recommendations
- A simulation analysis of sequencing rules in a flexible flowline
- A note on scheduling hybrid flow systems
- Comparison of hybrid systems and fluid stochastic Petri nets
- scientific article; zbMATH DE number 786521
- scientific article; zbMATH DE number 428258
- scientific article
- A comparative study of dispatching rules in dynamic flowshops and jobshops
- scientific article; zbMATH DE number 912572
- Modeling and Performance Evaluation of a Series-parallel Flow Line System with Finite Buffers
Cited In (6)
- Bottleneck-based heuristics to minimize tardy jobs in a flexible flow line with unrelated parallel machines
- Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage
- Title not available (Why is that?)
- The hybrid flow shop scheduling problem
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- A bottleneck-based heuristic for minimizing makespan in a flexible flow line with unrelated parallel machines
This page was built for publication: A comparison of sequencing rules in static and dynamic hybrid flow systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4252124)