scientific article; zbMATH DE number 776077
From MaRDI portal
Publication:4840097
Recommendations
- Flow-shop scheduling with flexible processors
- Shop scheduling problems with multiprocessor tasks on dedicated processors
- Heuristics for scheduling in a flow shop with multiple processors
- Scheduling in network flow shops
- Batching and scheduling in a multi-machine flow shop
- scientific article; zbMATH DE number 7722
- Hybrid flow-shop scheduling problems with multiprocessor task systems.
- Flow shop scheduling with flexible processing times
- Scheduling multiprocessor tasks for mean flow time criterion
- Scheduling unit processing time jobs on an m-machine flow-shop
Cited in
(13)- A hybrid two-stage flowshop with part family, batch production, major and minor set-ups
- A new heuristic for minimal makespan in flow shops with multiple processors and no intermediate storage.
- A polynomial time approximation scheme for the two-stage multiprocessor flow shop problem
- Geometrical heuristics for multiprocessor flowshop scheduling with uniform machines at each stage
- Heuristics for scheduling in a flow shop with multiple processors
- A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recircu\-lation
- The consecutive multiprocessor job scheduling problem
- A note on makespan minimization in two-stage flexible flow shops with uniform machines
- Flexible flow shop scheduling with uniform parallel machines
- scientific article; zbMATH DE number 4152123 (Why is no real title available?)
- Approximation algorithms for the parallel flow shop problem
- Sequencing and scheduling in flowshops with task redistribution
- A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4840097)