Geometrical heuristics for multiprocessor flowshop scheduling with uniform machines at each stage
From MaRDI portal
Publication:1607975
DOI10.1002/JOS.98zbMATH Open1009.90044OpenAlexW1999244577MaRDI QIDQ1607975FDOQ1607975
Authors: Sergey Sevastyanov
Publication date: 8 August 2002
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/jos.98
Recommendations
Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Cites Work
- Optimal two- and three-stage production schedules with set-up time included
- The Complexity of Flowshop and Jobshop Scheduling
- Vector Summation in Banach Space and Polynomial Algorithms for Flow Shops and Open Shops
- Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard
- Minimizing makespan in hybrid flowshops
- Title not available (Why is that?)
- Title not available (Why is that?)
Cited In (7)
- A Pareto-based adaptive variable neighborhood search for biobjective hybrid flow shop scheduling problem with sequence-dependent setup time
- A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines
- The hybrid flow shop scheduling problem
- Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility
- Flexible flow shop scheduling with uniform parallel machines
This page was built for publication: Geometrical heuristics for multiprocessor flowshop scheduling with uniform machines at each stage
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1607975)