Minimizing maximum tardiness and number of tardy jobs on parallel machines subject to minimum flow-time
From MaRDI portal
Publication:4661237
DOI10.1057/PALGRAVE.JORS.2601638zbMATH Open1181.90115OpenAlexW2015791519MaRDI QIDQ4661237FDOQ4661237
Authors:
Publication date: 4 April 2005
Published in: The Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2601638
Recommendations
- Minimizing the number of tardy jobs for \(m\) parallel machines
- Parallel machine scheduling with minimum number of tardy jobs: approximation and exponential algorithms
- Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates
- Minimizing total tardiness on parallel machines with preemptions
- Minimizing the weighted number of tardy jobs on parallel processors
- Minimizing total tardiness in an unrelated parallel-machine scheduling problem
- Minimizing maximum flowtime of jobs with arbitrary parallelizability
- An improved max-flow-based lower bound for minimizing maximum lateness on identical parallel machines
- Minimization of earliness, tardiness and due date penalties on uniform parallel machines with identical jobs
- Minimizing the weighted number of tardy jobs on multiple machines: a review
Cited In (9)
- Bicriteria multi-machine scheduling with equal processing times subject to release dates
- Generating efficient schedules for identical parallel machines involving flow-time and tardy jobs
- Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs
- Impact of worker and shop flexibility on assembly cells
- A note on the maximum number of on-time jobs on parallel identical machines.
- A tardiness-augmented approximation scheme for rejection-allowed multiprocessor rescheduling
- Fuzzy bi-criteria scheduling on parallel machines involving weighted flow time and maximum tardiness
- Minimum weighted number of tardy jobs on an \(m\)-machine flow-shop with a critical machine
- Job Tardiness in Unequal Parallel Processor Systems
This page was built for publication: Minimizing maximum tardiness and number of tardy jobs on parallel machines subject to minimum flow-time
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4661237)