Minimizing the weighted number of tardy jobs on parallel processors
From MaRDI portal
Publication:1887912
DOI10.1016/j.ejor.2003.06.027zbMath1067.90047MaRDI QIDQ1887912
Rym M'Hallah, Robert L. Bulfin
Publication date: 22 November 2004
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2003.06.027
90C57: Polyhedral combinatorics, branch-and-bound, branch-and-cut
90B35: Deterministic scheduling theory in operations research
90C27: Combinatorial optimization
Related Items
Maximizing the weighted number of just-in-time jobs in flow shop scheduling, Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs
Cites Work
- Unnamed Item
- Unnamed Item
- Minimizing the number of tardy jobs for \(m\) parallel machines
- Parallel machine scheduling to minimize costs for earliness and number of tardy jobs
- Minimizing the weighted number of tardy jobs on a single machine
- Parallel Machine Scheduling by Column Generation
- An O(n) algorithm for the multiple-choice knapsack linear program
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Solving Parallel Machine Scheduling Problems by Column Generation
- An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs