Minimization of earliness, tardiness and due date penalties on uniform parallel machines with identical jobs
From MaRDI portal
Publication:1761111
Recommendations
- Multiple-machine scheduling with earliness, tardiness and completion time penalties
- Parallel machine scheduling to minimize costs for earliness and number of tardy jobs
- Minimizing weighted earliness-tardiness and due-date cost with unit processing-time jobs
- Due-window assignment with identical jobs on parallel uniform machines
- scientific article; zbMATH DE number 4059106
Cites work
- scientific article; zbMATH DE number 4059106 (Why is no real title available?)
- scientific article; zbMATH DE number 44978 (Why is no real title available?)
- A survey of the state-of-the-art of common due date assignment and scheduling research
- Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem
- Due-date assignment and early/tardy scheduling on identical parallel machines
- Due-date assignment on uniform machines
- Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date
- Equivalence of mean flow time problems and mean absolute deviation problems
- Optimal due date assignment in multi-machine scheduling environments
- Parallel-Machine Scheduling Problems with Earliness and Tardiness Penalties
- Scheduling with common due date, earliness and tardiness penalties for multimachine problems: a survey
- Sequencing with Earliness and Tardiness Penalties: A Review
- Single Stage Minimum Absolute Lateness Problem with a Common Due Date on Non-Identical Machines
Cited in
(14)- An efficient algorithm for minimizing earliness, tardiness, and due-date costs for equal-sized jobs
- Lower bounds for the earliness-tardiness scheduling problem on parallel machines with distinct due dates
- A multi-agent system for the weighted earliness tardiness parallel machine problem
- Minimizing the sum of earliness/tardiness in identical parallel machines schedule with incompatible job families: An improved MIP approach
- A heuristic for single machine common due date assignment problem with different earliness/tardiness weights
- Minimizing the sum of job earliness and tardiness in a multimachine system
- Scheduling identical parallel machines with fixed delivery dates to minimize total tardiness
- Optimal restricted due date assignment in scheduling
- An intelligent water drop algorithm to identical parallel machine scheduling with controllable processing times: a just-in-time approach
- A note: minmax due-date assignment problem with lead-time cost
- Minimizing total tardiness and earliness on unrelated parallel machines with controllable processing times
- Scheduling problems with two competing agents to minimized weighted earliness-tardiness
- Hierarchical optimization with double due dates on an unbounded parallel-batching machine to minimize maximum lateness
- Minimizing maximum tardiness and number of tardy jobs on parallel machines subject to minimum flow-time
This page was built for publication: Minimization of earliness, tardiness and due date penalties on uniform parallel machines with identical jobs