Scheduling with common due date, earliness and tardiness penalties for multimachine problems: a survey
From MaRDI portal
Publication:1765094
DOI10.1016/j.mcm.2003.05.019zbMath1098.90031OpenAlexW1980904333WikidataQ57633933 ScholiaQ57633933MaRDI QIDQ1765094
Publication date: 22 February 2005
Published in: Mathematical and Computer Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.mcm.2003.05.019
Deterministic scheduling theory in operations research (90B35) Research exposition (monographs, survey articles) pertaining to operations research and mathematical programming (90-02)
Related Items (26)
Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times ⋮ A faster branch-and-bound algorithm for the earliness-tardiness scheduling problem ⋮ A survey on scheduling problems with due windows ⋮ Optimal restricted due date assignment in scheduling ⋮ Minimizing weighted earliness-tardiness on parallel machines using hybrid metaheuristics ⋮ Efficient constructive and composite heuristics for the permutation flowshop to minimise total earliness and tardiness ⋮ Equitable scheduling on a single machine ⋮ Range of lower bounds ⋮ Exponential neighborhood search for a parallel machine scheduling problem ⋮ Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain ⋮ Four single-machine scheduling problems involving due date determination decisions ⋮ Two-agent single-machine scheduling with assignable due dates ⋮ Minimization of earliness, tardiness and due date penalties on uniform parallel machines with identical jobs ⋮ Scheduling job classes on uniform machines ⋮ A multi-agent system for the weighted earliness tardiness parallel machine problem ⋮ Pseudo-polynomial dynamic programming for an integrated due date assignment, resource allocation, production, and distribution scheduling model in supply chain scheduling ⋮ Single‐machine common flow allowance scheduling with aging effect, resource allocation, and a rate‐modifying activity ⋮ Hierarchical production planning and scheduling in a multi-product, batch process environment ⋮ Minimizing total earliness and tardiness for common due date single-machine scheduling with an unavailability interval ⋮ Heuristic and exact algorithms for the two-machine just in time job shop scheduling problem ⋮ Solving integrated process planning, dynamic scheduling, and due date assignment using metaheuristic algorithms ⋮ A unified heuristic and an annotated bibliography for a large class of earliness-tardiness scheduling problems ⋮ A filtered beam search method for the \(m\)-machine permutation flowshop scheduling problem minimizing the earliness and tardiness penalties and the waiting time of the jobs ⋮ Unrelated parallel machine scheduling with multiple time windows: an application to Earth observation satellite scheduling ⋮ Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries for multiple customers in supply chains ⋮ Scheduling problems with a common due window assignment: A survey
Cites Work
- Unnamed Item
- Unnamed Item
- Equivalence of mean flow time problems and mean absolute deviation problems
- The complexity of scheduling job families about a common due date
- On the complexity and some properties of multi-stage scheduling problems with earliness and tardiness penalties
- Parallel machine earliness and tardiness scheduling with proportional weights
- Minimizing the sum of absolute deviations about a common due date for the two-machine flow shop problem
- An improved dynamic programming algorithm for the single-machine mean absolute deviation problem with a restrictive common due date
- Minimizing the sum of absolute lateness in single-machine and multimachine scheduling
- Minimizing the average deviation of job completion times about a common due date
- Sequencing with Earliness and Tardiness Penalties: A Review
- Single- and multiple-processor models for minimizing completion time variance
- Minimizing absolute and squared deviations of completion times with different earliness and tardiness penalties and a common due date
- The Complexity of Flowshop and Jobshop Scheduling
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Heuristics for Multimachine Scheduling Problems with Earliness and Tardiness Costs
- Heuristics for multimachine minmax scheduling problems with general earliness and tardiness costs
- Heuristic algorithms for unrelated parallel machine scheduling with a common due date, release dates, and linear earliness and tardiness penalties
- Scheduling in a two-machine flowshop with batch processing machine(s) for earliness/tardiness measure under a common due date
- Minmax earliness-tardiness costs with unit processing time jobs
- Flow shop scheduling algorithms for minimizing the completion time variance and the sum of squares of completion time deviations from a common due date
This page was built for publication: Scheduling with common due date, earliness and tardiness penalties for multimachine problems: a survey