Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain
From MaRDI portal
Publication:2463495
Recommendations
- A heuristic approach to a single stage assembly problem with transportation allocation
- Synchronizing production and air transportation scheduling using mathematical programming models
- Supply chain scheduling with parallel machines
- The supply chain scheduling problem with transportation and batching
- Supply chain scheduling in assembly systems
Cites work
- A decision theory based scheduling procedure for single-machine weighted earliness and tardiness problems
- Algorithm for minimizing weighted earliness penalty in single-machine problem
- Effects of change of scale on optimality in a scheduling model with priorities and earliness/tardiness penalties
- Equivalence of mean flow time problems and mean absolute deviation problems
- Heuristic algorithms for unrelated parallel machine scheduling with a common due date, release dates, and linear earliness and tardiness penalties
- scientific article; zbMATH DE number 4059106 (Why is no real title available?)
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- scientific article; zbMATH DE number 825000 (Why is no real title available?)
- Integrated Scheduling of Production and Distribution Operations
- Machine scheduling with transportation considerations
- Minimizing the average deviation of job completion times about a common due date
- Minimizing the sum of job earliness and tardiness in a multimachine system
- Optimization by simulated annealing
- Optimization by Simulated Annealing: An Experimental Evaluation; Part I, Graph Partitioning
- Scheduling with common due date, earliness and tardiness penalties for multimachine problems: a survey
- Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times
- Simulated annealing: A tool for operational research
- Single machine scheduling to minimize weighted earliness subject to no tardy jobs
- Synchronized development of production, inventory, and distribution schedules
Cited in
(13)- Synchronizing production and air transportation scheduling using mathematical programming models
- Integrated production and distribution with fixed delivery departure dates
- Integrated production and distribution scheduling problems related with fixed delivery departure dates and number of late orders
- Parallel batch processing machines scheduling in cloud manufacturing for minimizing total service completion time
- Integrated production and logistics planning: contract manufacturing and choice of air/surface transportation
- Risk based optimization of electronics manufacturing supply chains
- A heuristic approach to a single stage assembly problem with transportation allocation
- Dispatching problems for parallel machines in the TFT‐LCD assembly process
- A review of synchronization problems in parts-to-picker warehouses
- Integrated production and transportation scheduling problem under nonlinear cost structures
- New exact and heuristic algorithms for general production and delivery integration
- Maxflow-based integrated network design and scheduling problems with downgraded capacities
- A modified Pareto genetic algorithm for multi-objective build-to-order supply chain planning with product assembly
This page was built for publication: Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2463495)