Integrated production and transportation scheduling problem under nonlinear cost structures
From MaRDI portal
Cites work
- A Dynamic Model for Inventory Lot Sizing and Outbound Shipment Scheduling at a Third-Party Warehouse
- A fixed interval due-date scheduling problem with earliness and due-date costs
- A Primer in Column Generation
- A survey of the state-of-the-art of common due date assignment and scheduling research
- A survey on scheduling problems with due windows
- Combining Column Generation and Lagrangian Relaxation
- Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain
- Coordination of production and interstage batch delivery with outsourced distribution
- Decomposition Principle for Linear Programs
- Due-window assignment with identical jobs on parallel uniform machines
- Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date
- Earliness–Tardiness Scheduling Problems, II: Deviation of Completion Times About a Restrictive Common Due Date
- Economic Lot-Sizing for Integrated Production and Transportation
- Effective zero-inventory-ordering policies for the single-warehouse multiretailer problem with piecewise linear cost structures
- Exploring relaxation induced neighborhoods to improve MIP solutions
- Finding efficient make-to-order production and batch delivery schedules
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- scientific article; zbMATH DE number 2084780 (Why is no real title available?)
- Integrated production and distribution scheduling with a perishable product
- Integrated production and distribution scheduling with committed delivery dates
- Integrated production and distribution with fixed delivery departure dates
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Integrated production and transportation scheduling with order-dependent inventory holding costs
- Integrated production, inventory and delivery problems: complexity and algorithms
- Integrated Scheduling of Production and Two-Stage Delivery of Make-to-Order Products: Offline and Online Algorithms
- Minimizing earliness and tardiness costs in stochastic scheduling
- Modeling and design of global logistics systems: a review of integrated strategic and tactical models and design algorithms
- New exact algorithms for one-machine earliness-tardiness scheduling
- New exact and approximation algorithms for integrated production and transportation scheduling with committed delivery due dates and order acceptance
- No-wait flowshop scheduling problem with two criteria; total tardiness and makespan
- On the Effectiveness of Zero-Inventory-Ordering Policies for the Economic Lot-Sizing Model with a Class of Piecewise Linear Cost Structures
- Optimal Single-Machine Scheduling with Earliness and Tardiness Penalties
- Optimisation model for multi-item multi-echelon supply chains with nested multi-level products
- Optimizing production and transportation in a commit-to-delivery business mode
- Production and Transportation Integration for Commit-to-Delivery Mode with General Shipping Costs
- Scheduling with Fixed Delivery Dates
- Sequencing the processing of incoming mail to match an outbound truck delivery schedule
- Sequencing with Earliness and Tardiness Penalties: A Review
- Single machine scheduling to minimize weighted earliness subject to maximum tardiness
- Single machine scheduling with delivery dates and cumulative payoffs
- Strategic design of distribution systems with economies of scale in transportation
- Trade-offs between the stepwise cost function and its linear approximation for the modular hub location problem
- Two faster algorithms for coordination of production and batch delivery: a note
- Two-agent scheduling of unit processing time jobs to minimize total weighted completion time and total weighted number of tardy jobs
- Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications
Cited in
(3)- New exact and heuristic algorithms for general production and delivery integration
- Integrated production and transportation rescheduling with type-dependent setup times and multiple shipping modes
- Integrated production and transportation scheduling under no on-site storage, sequence-dependent setups, and multi-mode transportation
This page was built for publication: Integrated production and transportation scheduling problem under nonlinear cost structures
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6555171)