Single processor scheduling with job values depending on their completion times
From MaRDI portal
Publication:880588
DOI10.1007/s10951-006-0004-6zbMath1154.90462OpenAlexW1971744510MaRDI QIDQ880588
Publication date: 15 May 2007
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-006-0004-6
Related Items
An extended study on an open-shop scheduling problem using the minimisation of the sum of quadratic completion times ⋮ A branch and bound algorithm for single machine scheduling with deteriorating values of jobs ⋮ Single machine scheduling with delivery dates and cumulative payoffs ⋮ Single machine group scheduling with time and position dependent processing times ⋮ Performance guarantees for a scheduling problem with common stepwise job payoffs ⋮ Minimization of the total completion time for asynchronous transmission in a packet data-transmission system
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Fast approximation algorithm for job sequencing with deadlines
- Scheduling with batching: A review
- Linear-Time Algorithms for Scheduling on Parallel Processors
- Algorithms for Scheduling Independent Tasks
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Single Machine Scheduling to Minimize Batch Delivery and Job Earliness Penalties
- An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
- A Functional Equation and its Application to Resource Allocation and Sequencing Problems