Publication | Date of Publication | Type |
---|
A survey on scheduling problems with due windows | 2016-07-25 | Paper |
A Problem of Scheduling Jobs with Non-Monotonic Stepwise Values | 2015-07-15 | Paper |
On a single machine-scheduling problem with separated position and resource effects | 2015-04-28 | Paper |
Makespan optimization in a single-machine scheduling problem with dynamic job ready times-complexity and algorithms | 2015-02-06 | Paper |
Scheduling problems with a common due window assignment: A survey | 2014-08-22 | Paper |
Parallel machine scheduling and common due window assignment with job independent earliness and tardiness costs | 2014-08-01 | Paper |
Strong NP-hardness of scheduling problems with learning or aging effect | 2013-09-03 | Paper |
Soft due window assignment and scheduling of unit-time jobs on parallel machines | 2013-02-18 | Paper |
Neighbourhood Properties in Some Single Processor Scheduling Problem with Variable Efficiency and Additional Resources | 2012-08-19 | Paper |
Scheduling Problems with Learning and Ageing Effects: A Survey | 2012-08-19 | Paper |
Scheduling Jobs with Linear Model of Simultaneous Ageing and Learning Effects | 2012-08-19 | Paper |
Scheduling an unbounded batching machine with job processing time compatibilities | 2012-03-19 | Paper |
Resource Management in Machine Scheduling Problems: A Survey | 2011-06-28 | Paper |
New perspectives in VLSI design automation: deterministic packing by sequence pair | 2010-12-13 | Paper |
Scheduling jobs under an aging effect | 2010-10-14 | Paper |
The learning effect: getting to the core of the problem | 2010-03-24 | Paper |
Resource level minimization in the discrete-continuous scheduling | 2009-12-07 | Paper |
The minimum spanning tree problem with fuzzy costs | 2009-07-06 | Paper |
https://portal.mardi4nfdi.de/entity/Q3619079 | 2009-04-03 | Paper |
https://portal.mardi4nfdi.de/entity/Q3619081 | 2009-04-03 | Paper |
https://portal.mardi4nfdi.de/entity/Q5301734 | 2009-01-20 | Paper |
https://portal.mardi4nfdi.de/entity/Q5301735 | 2009-01-20 | Paper |
A scheduling problem with job values given as a power function of their completion times | 2008-11-18 | Paper |
Scheduling jobs in a contaminated area: a model and heuristic algorithms | 2008-08-14 | Paper |
A new approach to the learning effect: Beyond the learning curve restrictions | 2008-04-28 | Paper |
Single processor scheduling with job values depending on their completion times | 2007-05-15 | Paper |
Parallel Processing and Applied Mathematics | 2007-05-02 | Paper |
https://portal.mardi4nfdi.de/entity/Q3417375 | 2007-01-29 | Paper |
Scheduling in a contaminated area: a model and polynomial algorithms | 2006-05-29 | Paper |
Batching work and rework processes with limited deterioration of reworkables | 2006-01-10 | Paper |
https://portal.mardi4nfdi.de/entity/Q5707771 | 2005-11-24 | Paper |
Mirror image property for the optimal solutions of two single processor scheduling problems with due intervals determination | 2005-10-26 | Paper |
Positive half-products and scheduling with controllable processing times | 2005-04-21 | Paper |
https://portal.mardi4nfdi.de/entity/Q4667107 | 2005-04-19 | Paper |
Scheduling jobs with position-dependent processing times | 2005-04-04 | Paper |
Single machine group scheduling with resource dependent setup and processing times | 2005-02-09 | Paper |
Scheduling jobs with piecewise linear decreasing processing times | 2004-03-15 | Paper |
https://portal.mardi4nfdi.de/entity/Q4433440 | 2003-12-15 | Paper |
Hybrid flow-shop scheduling problems with multiprocessor task systems. | 2003-10-14 | Paper |
https://portal.mardi4nfdi.de/entity/Q4789850 | 2003-04-23 | Paper |
Minimizing the total weighted completion time of deteriorating jobs | 2002-07-14 | Paper |
https://portal.mardi4nfdi.de/entity/Q2731287 | 2001-07-29 | Paper |
https://portal.mardi4nfdi.de/entity/Q2712369 | 2001-07-02 | Paper |
https://portal.mardi4nfdi.de/entity/Q2712358 | 2001-05-06 | Paper |
Minimizing maximum lateness under linear deterioration | 2001-03-28 | Paper |
A permutation flow-shop scheduling problem with convex models of operation processing times | 2001-01-17 | Paper |
https://portal.mardi4nfdi.de/entity/Q4789855 | 2001-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q4789911 | 2001-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q4789916 | 2001-01-01 | Paper |
Single machine batch scheduling with resource dependent setup and processing times | 2001-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q4233363 | 1999-08-19 | Paper |
Minimization of the makespan in a two-machine problem under given resource constraints | 1999-07-11 | Paper |
Single machine scheduling subject to deadlines and resource dependent processing times | 1999-02-22 | Paper |
Genetic algorithm for the permutation flow-shop scheduling problem with linear models of operations | 1998-12-06 | Paper |
Bicriterion Single Machine Scheduling with Resource Dependent Processing Times | 1998-05-12 | Paper |
Single machine sequencing with linear models of release dates | 1998-03-25 | Paper |
https://portal.mardi4nfdi.de/entity/Q4433434 | 1996-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q4433436 | 1996-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q4433437 | 1996-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q4433439 | 1996-01-01 | Paper |
Single machine group scheduling with ordered criteria | 1995-08-27 | Paper |
Scheduling to minimize the total weighted completion time with a constraint on the release time resource consumption | 1995-01-11 | Paper |
Resource optimal control in some single-machine scheduling problems | 1994-08-21 | Paper |
Single machine scheduling problem with a common deadline and resource dependent release dates | 1992-06-26 | Paper |
https://portal.mardi4nfdi.de/entity/Q3211101 | 1990-01-01 | Paper |
Minimization of resource consumption under a given deadline in the two- processor flow-shop scheduling problem | 1989-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3481474 | 1988-01-01 | Paper |
General flow-shop scheduling with resource constraints | 1988-01-01 | Paper |
On time-optimal control of a sequence of projects of activities under time-variable resource | 1988-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3818111 | 1988-01-01 | Paper |
Job-shop scheduling with resource-time models of operations | 1987-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3775317 | 1987-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3801423 | 1987-01-01 | Paper |
Time-optimal control in a single machine problem with resource constraints | 1986-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3741388 | 1986-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3773681 | 1986-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3804436 | 1986-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3700361 | 1985-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3216418 | 1984-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3220062 | 1984-01-01 | Paper |
The equivalence of local and global time-optimal control of a complex of operations | 1983-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3852752 | 1978-01-01 | Paper |