Scheduling to minimize the total weighted completion time with a constraint on the release time resource consumption
From MaRDI portal
Publication:1341400
DOI10.1016/0895-7177(94)90206-2zbMath0810.90068OpenAlexW2059689559MaRDI QIDQ1341400
Publication date: 11 January 1995
Published in: Mathematical and Computer Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0895-7177(94)90206-2
Related Items
Group scheduling with deteriorating jobs and allotted resource under limited resource availability constraint ⋮ Single machine scheduling problems with resource dependent release times ⋮ Scheduling with controllable release dates and processing times: Makespan minimization ⋮ Scheduling with controllable release dates and processing times: total completion time minimization ⋮ A scheduling problem with job values given as a power function of their completion times ⋮ SCHEDULING WITH DISCRETELY COMPRESSIBLE RELEASE DATES TO MINIMIZE MAKESPAN ⋮ On minimizing resource consumption with constraints on the makespan and the total completion time ⋮ Single machine earliness-tardiness scheduling with resource-dependent release dates
Cites Work
- Unnamed Item
- Time-optimal control in a single machine problem with resource constraints
- Single machine scheduling problem with a common deadline and resource dependent release dates
- Scheduling with resource-dependent release dates—a comparison of two different resource consumption functions
- Scheduling to minimize release-time resource consumption and tardiness penalties