Single machine group scheduling with resource dependent setup and processing times
From MaRDI portal
Publication:707136
DOI10.1016/J.EJOR.2002.11.004zbMATH Open1132.90325OpenAlexW3023442533MaRDI QIDQ707136FDOQ707136
Marie-Claude Portmann, M. Y. Kovalyov, Adam Janiak
Publication date: 9 February 2005
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2002.11.004
Cites Work
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- Scheduling with batching: A review
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Computational Gasdynamics
- Single machine batch scheduling with resource dependent setup and processing times
- Single machine scheduling problem with a common deadline and resource dependent release dates
- A polynomial algorithm for a one machine batching problem
- Single machine scheduling subject to deadlines and resource dependent processing times
- Single machine group scheduling with ordered criteria
- Sequencing with ordered criteria, precedence and group technology constraints
- Using geometric techniques to improve dynamic programming algorithms for the economic lot-sizing problem and extensions
- Single machine scheduling with discretely controllable processing times
- Time-optimal control in a single machine problem with resource constraints
- Resource optimal control in some single-machine scheduling problems
- Single machine batch scheduling with deadlines and resource dependent processing times
- Minimizing the number of late jobs under the group technology assumption
- Scheduling to minimize the total compression and late costs
- Scheduling to minimize release-time resource consumption and tardiness penalties
Cited In (16)
- Title not available (Why is that?)
- Single machine group scheduling with decreasing time-dependent processing times subject to release dates
- Single machine group scheduling with time dependent processing times and ready times
- Single machine batch scheduling with resource dependent setup and processing times
- A single machine carryover sequence-dependent group scheduling in PCB manufacturing
- A survey of scheduling with controllable processing times
- Optimal control strategies for single-machine family scheduling with sequence-dependent batch setup and controllable processing times
- Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources
- Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times
- A survey of scheduling problems with setup times or costs
- Single machine group scheduling with time and position dependent processing times
- Single machine scheduling problem with controllable processing times and resource dependent release times
- Optimal due date assignment and resource allocation in a group technology scheduling environment
- Title not available (Why is that?)
- Group scheduling with controllable setup and processing times: minimizing total weighted completion time
- Group sequencing around a common due date
This page was built for publication: Single machine group scheduling with resource dependent setup and processing times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q707136)