Some single machine scheduling problems with resource dependent set-up and processing times.
From MaRDI portal
Recommendations
- Single machine scheduling problems with resource dependent processing times
- Single-machine scheduling with time-and-resource-dependent processing times
- Single machine batch scheduling with resource dependent setup and processing times
- Single machine group scheduling with resource dependent setup and processing times
- Single-machine scheduling problems with time and position dependent processing times
- Single machine scheduling with batch-dependent setup times
- Single-machine scheduling problems with past-sequence-dependent setup times
- Single machine scheduling with resource dependent release times and processing times
- Single machine scheduling problems with position-dependent processing times
- Single machine scheduling subject to deadlines and resource dependent processing times
Cited in
(18)- Single machine batch scheduling with jointly compressible setup and processing times.
- Single and two-resource allocation algorithms for minimizing the maximal lateness in a single machine
- Single machine batch scheduling with deadlines and resource dependent processing times
- A survey of scheduling with controllable processing times
- Single-machine scheduling with time-and-resource-dependent processing times
- Single machine group scheduling with time and position dependent processing times
- Single machine scheduling problem with controllable processing time and setup under convex resource consumption costs
- Resource management in machine scheduling problems: a survey
- Single machine group scheduling problem with resource constraints setup and processing time
- Single machine scheduling problems with resource dependent processing times
- scientific article; zbMATH DE number 4072697 (Why is no real title available?)
- Bicriterion Single Machine Scheduling with Resource Dependent Processing Times
- Scheduling deteriorating jobs dependent on resources for the makespan minimization
- A single machine scheduling problem with availability constraints and sequence-dependent setup costs
- Single machine batch scheduling with resource dependent setup and processing times
- Single machine group scheduling with resource dependent setup and processing times
- Single machine scheduling problems with resource dependent release times
- Optimal due date assignment and resource allocation in a group technology scheduling environment
This page was built for publication: Some single machine scheduling problems with resource dependent set-up and processing times.
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4789855)